Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2019 |
REINFORCED MASONRY PRE-GROUT |
|
Approved |
|
| 09/04/2018 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
SOUTH EAST AREA OF LOADING DOCK AREA - SCREEN WALL (CMU) AT 0" - 24". OK TO GROUT PROGRESS AREAS. |
| 11/08/2017 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
EQUIPMENT PAD CURBS (6 AREAS) ON LEVEL #4 - REBAR TO BE EPOXIED. OK TO GROUT PROGRESS AREAS. |
| 04/20/2017 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
CURBS AT GL: I.5/6 - 6.5 AT LEVEL #4. OK TO GROUT WHEN VERTS ARE IN PLACE. |
| 03/15/2017 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
MASONRY PRE-GROUT ON LEVEL #4: MASONRY CURBS AT GL: 10.5/L - M; M/9.25 - 10; M/8 - 9; 11/I -N. OK TO PLACE GROUT IN PROGRESS AREAS. |
| 02/08/2017 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
LEVEL #4, GL: 5 - 7.5/M, CMU CONTAINMENT WALL IN SLAB. |
| 01/27/2017 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
TEP ELECTRIC VAULT; CMU WALLS TOPPED-OUT AT 19'6". OK TO PLACE GROUT. |
| 01/26/2017 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
TEP VALULT - CMU WALLS AT 12' - 16' AFFE. BEAM POCKETS AND PLACES; EMBEDS IN PLACE. OK TO GROUT PROGRESS AREAS. |
| 01/24/2017 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
CMU WALLS AT 8' - 12' AT TEP VAULT AREA. OK TO PLACE GROUT. |
| 01/20/2017 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
LINTEL/BEAM WELDED WITH #4 REBAR AT 16" O.C. |
| 01/11/2017 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
VAULT AREA: GL: M.1/2.5 - 4; 4/M.1 - M.8. OK TO GROUT AT 0" TO 48" AFFE. |