Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 03/05/2018 |
ENGINEERING - FINAL |
|
Approved |
|
| 06/12/2017 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
GC AND PLANS NOT ON SITE. |
| 06/08/2017 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
MET ON SITE WENT OVER BIKE PARKING. |
| 05/19/2017 |
ENGINEERING - FINAL |
|
Continued |
MET ON SITE WENT OVER ROOF DRAINS AND HAND RAILS. |
| 05/10/2017 |
ENGINEERING - FINAL |
|
Continued |
ADA PARKING ON EAST SIDE OF BUILDING UNDER 2%. |
| 05/02/2017 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
MET WITH GC ABOUT ADA PARKING AREAS. |
| 05/01/2017 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
MET WITH GC ABOUT AP PLANS FOR PARKING. |
| 11/14/2016 |
ENGINEERING - FINAL |
|
Continued |
GC NOT ON SITE MET WITH OWNER WENT OVER SITE . THEY NEED TO POVIDE REVIONS FOR ALL CHAGES TO AP PLANS. |
| 11/10/2016 |
ENGINEERING - FINAL |
|
Continued |
MET WITH GC ON SITE WENT OVER RAMPS AND ADA PARKING AREAS. |
| 10/20/2016 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
INSTALL SIDEWALKS AND RAMPS PER AP PLANS. |