Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T16CM01050
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2016 | REINFORCED MASONRY PRE-GROUT | Approved | IVRS - Inspection :* | |
| 07/22/2016 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 07/06/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* | |
| 07/06/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 3 footers detail 1-s2.r ok to pour | |
| 05/12/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | OK TO FINISH THE GROUT UPTO THE 11.5 FOOT LEVEL ABOVE THE EXISTING PARKING LOT. THIS CAN BE DONE ONCE THE APPROVAL FOR THE MODIFICATIONS TO THE ROOFING SECTION HAS BEEN SUBMITTED AND APPROVED BY THE REVIEWERS AT 201 N. STONE. HAVE THE ENGINEER OF RECORD SUBMIT THE STRUCTURAL DRAWING FOR ALL THE MODIFICATIONS AND HAVE THEM APPROVED BY C.O.T. PRIOR TO FINALING OUT THE GROUT ON ALL NEW WALLS. | |
| 05/04/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CREWS HAVE COMPLETED THE BLOCK WALLS ON THE NEW BUILDING UPTO APPROXIMATELY 9 TO 10 FEET, THEY HAVE BEEN APPROVED FOR THE GROUT UP THROUGH THIS LAST COURSE. AFTER THE GROUT IS COMPLETE THEY WILL BE WORKING ON COMPLETEING THE REMAINING WALLS TO THEIR FINAL HEIGHT. ONCE THIS WORK IS DONE THEY WILL CALL FOR THE FINAL GROUT INSPECTION. | |
| 04/18/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | THE WALL WORK WAS NOT COMPLETED THIS WEEKEND AND WILL NEED TO BE COMPLETED PRIOR TO PLACEMENT OF THE ADDITIONAL GROUT AND BOND BEAMS. | |
| 04/15/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | THE CREW WILL BE WORKING ON THE INSTALLATION OF THE MISSING REBAR IN 4 CELLS PRIOR TO LAYING ADDITIONAL ROWS OF BLOCK IN THE SECOND 4 FOOT COURSE. I CHECKED THE SITE AT THE END OF THE DAY. ALL THE REBARS HAS BEEN EPOXIED INTO SPACE AND ADDITIONAL BLOCK HAS BEEN LAID AT THIS TIME. THE CREW ADVISES ME THAT THEY WILL COMPLET THE COURSES UPTO 8' FEET OVER THE WEEKEND. THEY HAVE ASKED ABOUT THE LENTEL THAT IS NEEDED OVER THE DOORWAY. ADVISED THEM TO CHECK WITH THE ENGINEER OF RECORD FOR THE TYPE AND SIZE THAT WOULD BE NEEDED SINCE THE LENGTH OF THE SPANDREL IS OVER 8 FEET. I CHECKED THE SITE AT THE END OF THE DAY THEY ARE MISSING THREE COURSES OF BLOCK TO COMPLETE THE ROWS FULLY. THIS PORTION OF THE WORK IS BEIN DONE OVER THE WEEKEND AND WILL BE CHECKED ON MONDAY MORNING THE 18TH.L |
|
| 04/14/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | THE CONTRACTOR HAS INSTALLED THE FIRST 4 FEET OF THE WALL LOCATED AT THE SOUTH EAST CORNER OF THE BUILDING TO THE DOORWAY LOCATED ON THE EAST WALL. THE SITE HAS BEEN APPROVED FOR THE PLACEMENT OF THE GROUT IN THE LOWER PORTION, BUT NOTHING ABOVE THAT LEVEL. THE CREWS WILL CONTINUE ON THE WALL INSTALLATION FOR THE NEXT FOUR FEET BUT WILL NEED A PRE-GROUT INSPECTION PRIOR TO THE PLACEMENT OF THE GROUT. | |
| 04/05/2016 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection | IVRS - Inspection :* | |
| 04/01/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* |