Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/29/2013 |
PLUMBING - FINAL |
|
Not ready for Inspection |
1. PVC water to have minimum 12" of cover at all points. 2. ABS under trailer to be supported every four feet. 3. ABS underground to be laid on a firm bed (no bridging). 4. Changes in direction to be made with a 45 degree ell. 5. Require a two way clean out where the building drain connects to the building sewer. All downstream clean-outs to be directional. 6. PVC sch. 40 may not be installed under the mobile home. 7. AVBs on all hose bibbs. |