Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2012 | PLUMBING - SEWER HCS CONNECT | Approved | IVRS - Inspection :* | |
| 07/15/2011 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* 1) 4" SDR 35 FROM NEW MANHOLE AT NORTHWEST CORNER OF LSS TO 4" SADDLE TAP ON EXISTING CLAY 2) WATER TEST 3) PROVIDE CITY APPROVED PLAN OF THIS INSTALLATION-APPROVED PLAN PAGE OC-201 SHOWS EXISTING MANHOLE FOR TERMINATION POINT |
|
| 06/29/2011 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* 1) 4" PVC SCHEDULE 40 REPLACES 4" SDR 35 FOR LSS FORCE MAIN FROM STUB UP TO NEW MANHOLE WITH 6" SDR STUB OUT OF MANHOLE BASE POURED 2) WATER TEST FORCE MAIN OK |
|
| 06/22/2011 | PLUMBING - SEWER HCS CONNECT | Partial Approval | IVRS - Inspection :* 1) 4" PVC SDR35 GRAVITY DRAINAGE FROM LSS TANK EXTERIOR (ONLY) TO NEW MAN HOLE WATER TEST OK. PROVIDE APPROVED MATERIAL INTO STRUCTURE 2) 4" PVC SDR 35 FORCE MAIN STUB UP APP 5' FROM LSS TANK TO NEW MANHOLE (SAME AS ABOVE) (WATER TST ONLY) 3) PROVIDE MATERIAL TYPE INFORMATION FROM ENGINEER OF RECORD 4) PVC SDR 35 IS NOT TYPICAL MATERIAL TYPE FOR PUMPED FORCE MAINS |