Permit: T09CM00182

Parcel: 14122004L


Addresses:

8755 S RITA RD


Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T09CM00182

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
08/20/2009 ENGINEERING - FINAL Approved I MET WITH THE DEVELOPER AND DISCUSSED THE REMAINING WORK THAT IS STILL NEEDED ON HIS SITE, AND WHAT IT WILL TAKE TO GET IT ALL COMPLETE. THE PREVIOUSLY NOTED ROCK RIP RAP HAS BEEN COMPLETED AS WELL AS THE MINOR GRADING OF THE SLOPES. THE CONTRACTOR HAS NOT ESTABLISHED THE TYPE OF MATERIAL THAT WILL BE NEED TO STABALIZE ALL OF THE OPEN AREAS, BUT HAS DISCUSSED IT WITH JOSEPH LINVILLE OF THE ZONING SECTION, THIS WORK WILL START TOMORROW MORNING. IF THE WORK IS NOT FULLY COMPLETED WITHIN A TIMELY MANOR A NOTICE OF VIOLATION WILL BE ISSUED TO THE PROPERTY OWNER FOR NOT FULLY DEVELOPING THE PROPERTY PER THE APPROVED STANDS AND SPECIFICATIONS OF THIS DEPARTMENT.
08/18/2009 ENGINEERING - FINAL Partial Approval THE SITE HAS BEEN CHECKED FOR THE FULL RELEASE OF THE SITE BUT HAS NOT BEEN FOUND TO BE COMPLETE AT THIS TIME FOR THE FOLLOWING REASONS:

1) COMPLETE ALL OF THE CONCRET FLAT WORK ADJACENT TO THE NEW BUILDING, THIS WILL INCLUDE SIDEWALKS AND LANDINGS.
2) STABALIZE OR VEGETATE ALL AREAS THAT HAVE BEEN DISTURBED ON THIS SITE.
3) INSTALL ALL OF THE RIP RAP AS SHOWN ON THE APPROVED PLANS PRIOR TO CALLING IN ANOTHER INSPECTION.
4) CLEAN THE FIRE ACCESS ROAD AROUND THIS SITE OF ALL TRASH AND DEBRIS THAT HAVE ACCUMULATED WITHIN THE BOUNDARIES.
5) COMPLETE THE GRADING OF ALL SLOPES AND ENSURE THAT THEY HAVE BANK PROTECTION MATERIAL ON THEM AS SPECIFIED BY THE LANDSCAPING DEPARTMENT.

CONTACT JOSEPH LINVILLE AT 791-5550 AND ASK HIM TO SPECIFY WHAT TYPE OF STABALIZATION MATERIAL IS REQUIRED FOR THIS SITE. THIS WILL HELP YOU TO ENSURE THAT YOU INSTALL THE RIGHT MATERIAL THE FIRST TIME THAT IT IS DONE. CALL ME DAVID ROBERTS AT 349-7643 ONCE OF THIS WORK HAS BEEN COMPLETED AND IS READY FOR THE FINAL INSPECTION.
06/04/2009 ENGINEERING - FINAL Not ready for Inspection MET ON-SITE WITH MEMBERS OF STELLAR CORPORATION TO LOOK AT THE PROGRESS THAT THEY HAVE MADE IN THE PAST 2 WEEKS. THEY ARE CURRENTLY WORKING ON LAYING THE DRAINAGE PIPES AROUND THE EXTERIOR PERIMETER OF THE BUILDING AND HAVE SET THE MANHOLE BASES WITHIN THIS RUN. I HAVE ASKED THAT THEY CALL ME OUT WHEN THEY HAVE COMPLETED THE BACKFILL OF THE AREA AND ARE STARTING TO STACK THE MANHOLES ONTO THEBASES. THEY ARE ANTICIPATING BEING COMPLETE WITH THIS PROJECT BETWEEN AUGUST AND OCTOBER THIS YEAR.
04/02/2009 ENGINEERING - FINAL Not ready for Inspection MET ON SITE WITH STRUNK EXCAVATING

SILT FENCE CALLED OUT ON PLAN IS TO BE REPLACED WITH WATTLE OR A V-DITCH
SOME PORTIONS OF EROSION CONTROLS NOT TO BE INSTALLED
PLAN WILL BE UPDATED TO REFLECT CHANGES ONCE APPROVED

SHILO WITH RW STRUNK 631-3944