Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 03/11/2010 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 03/10/2010 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 06/26/2009 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) REMOVE M/C CABLE FROM INSIDE FILTER BANK 2) CONTINUE WALL FLASHING TO FLOOR 3) RAISE PIPING OFF OF FLOOR 4) PROVIDE MAKE-UP AIR 5) INTER LOCK MAKE UP AIR WITH EXHAUST FAN 6) SEAL HOLES IN HOOD EXTERIORS 7) REPAIR AND CAULK TRIM AND FLASHING ON HOOD AND BACK SPALSH PANELS TO PREVENT ANY SHARP OR OTHER WISE HAZARDOUS EDGES 8) PROVIDE GREASE RECEPTORS ON HOODS 9) PROVIDE ROOF JACKS FOR EXHAUST HOODS AND ELECTRIC CONDUIT 10) PROVIDE ENGINEERED DRAWINGS FOR HOOD EXHAUST SYSTEM 11) PROVIDE ACCESS TO GREASE DUCT CHASE OR WRAP 12) PROVIDE DISCONNECTS FOR EXHAUST FANS 13) PROVIDE APPROVED CONDUIT ON ROOF 14) THIS IS NOT A COMPLETE LIST |