Inspection History Details
Inspection Status: Correction Required
Inspection History: GRADING - TIER REV
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2015 | GRADING - TIER REV | Correction Required | 1) REVISIONS MADE TO THE ORIGINAL GRADING PLAN. CHANGED ENGINEERING COMPANIES AND CIVIL ENGINEER. CONTRACTOR HAS THE APPROVED REVISED PLANS ON SITE. 2) NEED ENGINEER APPROVAL FOR CHANGE OF CONCRETE OUTFALL DRAINAGEWAYS ALONG THE NORTH SIDE OF SITE. CONTRACTOR WANTS TO SHOT CRETE THE DRAINAGEWAYS INSTEAD OF FORM AND POUR DUE TO SLOPE ELEVATIONS. 3) ADDITION OF A WALL ALONG THE EAST PERIMETER WITH ROCK RIP RAP ON SLOPE. 4) NEED PERMIT AND INSPECTIONS FOR RETAINING WALL ALONG THE NORTH PERIMETER. 5) NEED REPAIR AND STABILIZATION OF NORTH SLOPE. BRING SPOILS BACK ON SITE |
|
| 06/24/2015 | GRADING - TIER REV | Continued | 1) ENGINEER OF RECORD IS NO LONGER REPRESENTING THE PROJECT, HOWEVER A NEW CIVIL ENGINEER HAS BEEN BROUGHT ABOARD AND HAS MADE CHANGES TO THE CIVIL PLANS. 2) PROVIDE A REVISED SET OF PLANS FOR INSPECTION, THAT HAS BEEN APPROVED BY THE CITY OF TUCSON. 3) CONTRACTOR IS CONSTRUCTING A RETAINING WALL ALONG THE NORTH PERIMETER OF THE SITE. PROVIDE AN APPROVED SET OF PLANS FOR INSPECTION THAT SHOWS WALL DETAILS. 4) ENSURE STORM WATER CONTROLS REMAIN IN PLACE UNTIL THE NORTH SLOPE IS STABILIZED. |
|
| 04/08/2015 | GRADING - TIER REV | Continued | PER ENG REVIEWER, NORTH SLOPE ADJACENT TO EXISTING DRAINAGE WAY MUST BE HYDROSEEDED PRIOR TO FINAL RE ESTABLISH PERIMETER STORMWATER CONTROLS |