Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2009 | ENGINEERING - FINAL | Approved | ||
| 11/10/2008 | ENGINEERING - FINAL | Partial Approval | Ok for TEMP C of O Contractor needs to: 1. All remaining site work to be completed under permit T08CM00426. 2. Keep all construction debris activity and materials separated from public access. |
|
| 11/07/2008 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Close out grading permit. 2- Provide site cert. from engineer, per C.O.T. D.M. chapter XIV, section 14.2(7). 3- Separate all construction activity, materials and debris from public access. 4- Remove port-a-potty and dumpster from site. 5- Stabilize all areas disturbed by construction. 6- Backfill all open holes. 7- Remove construction trailer from site. 8- Address handrails on west side of building. (Slope 5%) Building 3. 9- Remove material off west fence line. Install per approved detail 2 on sheet 3. |