Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/11/2008 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
| 11/26/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean out drywall wash out in basin. Spoke to Nick site super. Explained to Nick if it happens again contractor will need to provide perk test showing basin work as designed. | |
| 09/25/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Clean wash out from around site. 2- Clean track out from site. Provide wash out pit for sub-contractors and ensure use. Spoke to site super Joe in regards to. |
|
| 08/01/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Basin holding water longer then 24 hours. |