Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2005 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* 1) IT HAS BEEN SIX WEEKS. HOW LONG DOES IT TAKE TO GET AN ADDRESS CORRECTION ? 2) SEE NOTE #1 FROM 6/16/05 3) CLOSET FLANGE OK |
|
| 06/30/2005 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) ADDRESSING BEING WORKED ON . 2) ABS DWV TRHU ROOF OK. COPPER OK INSULATION OK. 3) OK TO COVER ALL AREAS. 4) WILL RECALL WHEN CLOSET FLANGES INSTALLED. | |
| 06/23/2005 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PLEASE READ NOTE NUMBER ONE FROM 6/16/05 AND COMPLY. NON COMPLIANCE COULD RESULTS IN MISSED INSPECTIONS AND/OR REINSPECTION FEES. 2) SEE NOTE #2 FROM 6/16/05. 3) HOT WATER INSULATION NOT ACCEPTABLE: NOT INSTALLED CONTINUOUS, NOT INSTALLED TO MANUFACTURERS SPEC. 4) NO REDLINE CHANGES OVERHEAD WATER PIPING TO BE INSTALLED SQUARE AND PERPENDICULAR TO STRUCTURE AND IN A WORKMANSHIP LIKE MANNER. |
|
| 06/16/2005 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1) MULTIPLE BLDGS, MULTIPLE TENANTS, WILL REQUIRE TENANT SPACE NUMBERS ADDED TO PERMIT, AND THEN POSTED AT THE SUITES. 2) RECONNECT VENT AT P.O.C. 3) HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP. 4) NO PROVISION MADE FOR INSULATION ON WATER PIPING. 5) ANY CHANGES FROM PLAN TO BE REDLINE BEFORE NEXT INSPECTION. 6) ABS WATER TEST OK |