Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T00CM02316

Parcel: 21116006A

Inspection Status: Denied

Inspection History: ELECTRIC - FINAL

Date Description Inspector Results Comments
04/17/2001 ELECTRIC - FINAL Denied IVRS - Inspection 0935*1. BOND GUTTER WITH FUSES 250-96 2. BONDING DEVICE NEEDED AT CONCENTRICS 250-97 3. PLANS DO NOT SHOW SURGE ARRESTORS ON BREKERS OR FUSES RATED HIGHER THAN CONDUCTOR CAPACITY FUSE & BREAKERS ACCORDINGLY 4. TIGHTEN ALL SEALTIGHT FITTINGS AT INJECTOR STATION
04/03/2001 ELECTRIC - FINAL Denied IVRS - Inspection 0999* 1) WORKING CLEARANCE IN FRONT OF GUTTER WITH FUSES 2) NEED MANUFACTURERS INSTRUCTIONS FOR SURLE ARESTOR TO DETERMINE BREAKER SIZE (#14 AWG ON 30 AMP BREAKER) 3) PROTECT SEAL TITE PASSING THRU TO WELL METERS 4) LOOSE FITTINGS 5) INSTALL COVERS CORRECTLY INJECTOR STATION 6) NEED REVISED PLANS FOR THIS SITE
03/13/2001 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection 0000*