Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP21-0157
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/12/2025 | PDSD Engineering Division Pre-Construction SITE | Partial Pass | contractor install the footer for the trash enclosure, but it’s not per city specifications. Contractor also installed stormwater pipes that was never inspected by the City Of Tucson contractor needs to get the engineering of record to sign off on. It also inform the contractor anymore storm pipe that’s being installed. The city needs to be notified for inspection. Also informed the contractor any open trenches needs to have a fence around it. And the spoiled piles need to have wattles around it. |