Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP21-0157
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Complete (Recurring)
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | there’s no concerns at this time on the stormwater biweekly inspection | |
| 04/23/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | contractor needs to install more wattles along the fence line on the south east corner and along the east side by the bike path. Need to fence off all the open trenches area and install wattles around the spoils. | |
| 05/07/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | There’s some waddles that are missing over on the east end of the building that needs to be replaced | |
| 05/21/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | No changes as of today everything looks good | |
| 06/04/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | there is some wattles Storm drain wattles that were removed on the north end of the project contractor will replace them | |
| 07/02/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns with the biweekly stormwater inspection | |
| 07/16/2025 | SITE - Stormwater Follow-up | Not Ready | Contractors not ready it’s going to reschedule | |
| 07/17/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | informed the contractor that he can pour the bollards in the trash enclosure area | |
| 07/30/2025 | SITE - Stormwater Follow-up | Complete (Recurring) | No concerns at this time everything looks good |