Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP21-0157

Parcel: 11620637A


Addresses:

165 S LINDA AV


Inspection Status: Partial Pass

Inspection History: For trash and recycling enclosures

Permit Number - DP21-0157

Inspection Description - For trash and recycling enclosures

Inspection Status - Partial Pass

Date Description Inspector Results Comments
03/21/2025 For trash and recycling enclosures Partial Pass Ok to grout. Will need TSMR for height change to 10'.
06/26/2025 For trash and recycling enclosures Partial Pass vertical and horizontal reinforcement is good, okay to grout next lift.
07/14/2025 For trash and recycling enclosures Partial Pass Engineer redesign the trash enclosure it’s within city specifications and it looks like everything’s gonna work
07/16/2025 For trash and recycling enclosures Canceled Contractor canceled because of the rain today canceled the pour for the trash, enclosure floor and bollards
07/21/2025 For trash and recycling enclosures Failed The rebar for the floor is not completed too far away from the south wall need to add more horizontal bars. Contact or call me for reinspection tomorrow.
07/22/2025 For trash and recycling enclosures Partial Pass Contract is good to pour the floor for the trash enclosure
08/07/2025 For trash and recycling enclosures Partial Pass Contractor removed the floor for the trash enclosure because they didn’t like to finish. That was the contractors call. Now that they removed the floor they’re gonna have to dial in to the existing and have it reinspected.
08/18/2025 For trash and recycling enclosures Partial Pass contractor called in for the floor for the trash enclosure that was removed. Patterson inspected the dowels that run into the existing concrete Patterson pass the inspection.