Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 03/05/2026 |
|
|
Partial Pass |
contractor report the sidewalks on the west side right along with the ramp |
| 04/01/2026 |
|
|
Partial Pass |
contractor can pour the stairs on the south west side of the building. Everything looks good to pour. |
| 06/01/2026 |
|
|
Partial Pass |
contractor is good to pour the next 60 lineal feet of driveway on the south end of the building |
| 06/03/2026 |
|
|
Partial Pass |
contractor is good to pour the fifth floor in the driveway area south side of the building |
| 06/09/2026 |
|
|
Partial Pass |
our tractor can pour the driveway pour number six. Everything looks good at this time.. |
| 06/30/2026 |
|
|
Partial Pass |
I met with Todd the superintendent on the project and we went over the valley gutter that sits over there off of Linda |