Permit: DP21-0157

Parcel: 11620637A


Addresses:

165 S LINDA AV

Inspection Status: Partial Pass

Inspection History

Date Description Inspector Results Comments
02/04/2026 Partial Pass Contractor in backfill this the storm drain pipes on the north east corner that run into the wash
02/17/2026 Partial Pass Contractors good to pour the retaining wall at the south west corner of the building
04/08/2026 Partial Pass contractor is good to pour the first set of steps on the west side of the building and continue to form the rest of the steps
04/14/2026 Partial Pass contractor is good to backfill the 24 inch pipe north of the building storm drain.
04/28/2026 Partial Pass contractor is good to pour the border around the swimming pool
05/18/2026 Partial Pass good to pour the parking area on the south east corner of the building