Permit: DP19-0059

Parcel: 12404098A


Addresses:

947 N PARK AV

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
03/31/2021 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by RSALDAT1 - APPROVED
03/31/2021 PDSD Engineering Division Pre-Construction SITE DROBERTS Approved Entered by VLEON1 -
03/25/2021 PDSD Engineering Division Pre-Construction SITE BBENEDON Denied Entered by VLEON1 - Denied. No contact information provided. Project as well past reconstruction phase.