Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP19-0059
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/04/2021 | ENGR Grading Final | BBENEDON | Approved | Entered by VLEON1 - APPROVED |
07/23/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by RSALDAT1 - APPROVED |
06/16/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - Continued. Contractor performing work on building façade and working within the right of way. Lane closures are in effect, barricades in place. |
12/10/2019 | ENGR Grading Final | BBENEDON | Continued | Entered by DMERANZ1 - I spoke with the superintendent Bart, And I asked him to schedule inspections from his development package permit. He said he would pass it onto his project manager. Temporary fencing is been installed. Dirt work is started |
09/29/2021 | ENGR Grading Final | MHERNANDEZ | Approved | Entered by NGARCIA3 - APPROVED |
07/23/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED, CREWS WORKING ON THE LANDSCAPING ITEMS AT THIS TIME. THE CONTRACTOR WILL BE SEEKING A TCO FOR THIS SITE IN THE FUTURE BUT IS NOT READY AT THIS TIME. WORK CONTINUES ON THE NORTH, EAST AND WEST SIDES OF THE BUILDING AT THIS TIME, THIS INSPECTION WILL BE RESCHEDULED IN APPROXIMATELY 2 WEEKS. |
07/02/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED AT THIS TIME. MET WITH THE CONTRACTOR ON SITE TO LOOK AT SOME ISSUES WIT PARKING SPACES IN THE UNDER GROUND PARKING STRUCTURE. THEY HAVE 3 PARKING SPACES ON THE WEST SIDE OF THE RAMP DOWN INTO THE PARKING GARAGE THAT HAVE LESS THAN 3 FEET OF CLEARANCE FROM THE ROADWAY SURFACE TO THE GARAGE ROOF OR PIPING. |
05/27/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - Continued. Building progress. Contractor working in right of way, closures in place. |
04/20/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - |
03/31/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED, WORK IS VERTICAL ON THIS SITE AT THIS TIME. WILL MEET WITH THE CONTRACTOR IN APPROXIMATELY 4 WEEKS TO LOOK AT THE PARKING WITHIN THE STRUCTURE |
03/31/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED, WORK IS VERTICAL ON THIS SITE AT THIS TIME. WILL MEET WITH THE CONTRACTOR IN APPROXIMATELY 4 WEEKS TO LOOK AT THE PARKING WITHIN THE STRUCTURE. |
03/25/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VLEON1 - Continued. No contact information provided. Walked the site. Builder in process of applying exterior finish constructed building. |
02/04/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED AT THIS TIME, WORK ON THIS SITE IS MOSTLY VERTICAL AT THIS TIME, NOTHING WILL BE STARTED ON THE SITE WORK TILL THE SCAFFOLDING HAS BEEN REMOVED. |
10/19/2021 | ENGR Grading Final | BBENEDON | Approved | Entered by NGARCIA3 - Approved |