Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 03/23/2017 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by KROBLES1 - |
| 03/10/2017 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by RLEDONN1 - PROVIDE CERT LETTER FOR ALL DRAINAGE AND GRADING FROM ENGINEER OF RECORD. COMPLET ALL ROOF DRAINS. FASTEN ADA PARKING SIGNS TO BUILDING. COMPLET ALL LANDSCAPING ON SITE. |
| 03/09/2017 |
ENGR Engineering Final
|
RLEDONNE |
Continued |
Entered by RLEDONN1 - REMOVE ALL CONSTRUCTION EQUIPMENT FROM PARKING AREAS. INSTALL BIKE PARKING. PROVIDE COT AP CHANGES FOR BUS PARKING AREAS. REMOVE TEMP FENCEING AROUND SITE. REMOVE ALL TRASH FROM SITE. |
| 03/23/2017 |
ENGR Engineering Final
|
DROBERTS |
Approved |
Entered by KROBLES1 - |
| 03/10/2017 |
ENGR Engineering Final
|
RLEDONNE |
Partial Approval |
Entered by RLEDONN1 - SIDEWALKS ON WEST SIDE OF BUILDING UNDER 5%. |
| 03/09/2017 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by RLEDONN1 - NOTES ON FINAL GRADING. |