Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 

Permits

Parcel Number - 137117540
Date - 11/09/2026 5:48 a.m.
Total Number Of Permits - (4)
Permit Permit Status Entered Date Expired Date Unit Type Description
DP15-0091 Complete 06/10/2015 01/13/2019 Development Package TENTATIVE PLAT/FLD - OAKMORE SIX, LOTS 1-68
DP16-0029 Withdrwn 02/17/2016 N/A DEVPKG
T16CM02413 Final 04/01/2016 08/21/2018 COMBO SFR OAK1465 T16-M0016 R2: ADD EXTERIOR RECEPTACLE
T16CM02414 Final 04/01/2016 12/21/2018 COMBO SFR OAK1740 T16-M0015

Plans

Parcel Number - 137117540
Date - 11/09/2026 5:48 a.m.
Total Number Of Plans - 3
Plan Number Plan Status Application Date Expired Date Unit Type Description
S16-014 Final 02/17/2016 04/25/2020 SUBDIVISION FINAL PLAT - Oakmore Six
T15PRE0036 Closed 04/29/2015 N/A NEIGHBORHOOD NOTIFICATION
T16PI00002 Final 01/19/2016 02/28/2021 PAVING OAKMORE SIX LOTS 1-68 AND OAKMORE AT MIDVALE LOTS 133, 134, 151, 152 Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan I-2016-001 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction.