Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP14-0045
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/31/2017 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
09/01/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
09/01/2016 | ENGR Grading Final | MRUSSO | Approved | Entered by MRUSSO1 - |
07/14/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - LOOKED AT MULTI-USE TRAIL ALONG EAST PERIMETER OF SUBDIVISION - HEADERS IN PLACE, NO RIP RAP YET, PARTIAL APPOVAL |
03/22/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) CONTRCTOR WORKING ON RAODWAY AND CROSSING ALONG THE FAR SOUTH SIDE OF THE SITE 2) ANY UNDERGROUND SITE WORK MUST BE INSPECTED PRIOR TO COVER |
03/26/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRCTOR WORKING ON STORM WATER DRAINAGE STRUCTURES THROUGHOUT THE SITE. 2) NO SIGNIFICANT STORMWATER CONCERNS AT THIS TIME 3) ENSURE ALL CHANGES AND REVISIONS TO THE ORIGINAL PLANS ARE APPROVED AND PROVIDED FOR FINAL INSPECTION |
02/18/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME |
01/22/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - INSPECTED SECTION OF PEDESTRIAN ACCESS - SIDEWALK AND BASIN ACCESS RAMP LONG THE NE CORNER OF THE SITE. FORMS INSTALLED PER APPROVED PLAN - OK TO POUR CONCRETE. |
12/01/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) INSPECTED AND TOOK PICTURES OF STORM DRAIN WEIR AND PIPING ALONG THE WEST SIDE OF THE SITE. 2) CONTRACTOR INSTALLED SECTIONS OF PIPE AND POURED A CONCRETE WEIR AND CULERT WITHOUT INSPECTIONS FROM THE CITY OF TUCSON. 3) PRIOR TO FINAL APPROVAL PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD AND AS-BUILT DRAWING FOR INSPECTION. |
11/21/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - SPOKE WITH PROJECT MANAGER SET UP INSPECTION FOR NEXT WEEK |
10/09/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES PER PLAN |
08/07/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT SITE/GRADING CONCERNS AT THIS TIME |