Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 141383140
Parcel Search
Permits
Parcel Number - 141383140
Date - 12/23/2024 12:15 p.m.
Total Number Of Permits - (4)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
DS14-03 | Approved | 02/11/2014 | N/A | Zoning Compliance | 10990 E DREXEL RD - TSMR 4-02,2.5.B.2 Less than 5% encroachment into PRA. | |
DP14-0045 | Complete | 03/26/2014 | 02/01/2021 | Development Package | GRADING/SWPPP | |
DP13-0239 | Complete | 12/03/2013 | 11/01/2020 | Development Package | TENTATIVE PLAT - SIERRA MORADO UNIT 3 LOTS 01 THRU 173 | |
T13OT01437 | Final | 12/06/2013 | N/A | FLOODPLN | FUP - DP13-0239 and DP15-0043 |
Code Enforcement
Parcel Number - 141383140
Date - 12/23/2024 12:15 p.m.
Total Number Of Code Cases - 1
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T08DV07380 | Complian | 08/20/2008 | N/A | DNR_VIOL | ILLEGAL DUMPING OF GREENWASTE ON THIS PARCEL. REFER TO T08DV06834, WHICH WAS ORIGINAL COMPLAINT. |
Plans
Parcel Number - 141383140
Date - 12/23/2024 12:15 p.m.
Total Number Of Plans - 6
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CWH-13-0239 | Active | 12/03/2013 | 11/01/2020 | Basin | TENTATIVE PLAT - SIERRA MORADO UNIT 3 LOTS 01 THRU 173 | |
S14-008 | Final | 03/12/2014 | 07/31/2019 | MINOR SUBDIVISION | SIERRA MORADO UNIT 3 PHASE I | |
S14-009 | Final | 03/12/2014 | 07/31/2019 | MINOR SUBDIVISION | SIERRA MORADO UNIT 3 PHASE II | |
T14PI00005 | Final | 05/01/2014 | 12/10/2014 | OTHER | SIERRA MORADO UNIT 3 PH 1 (Construction Phase 1) PUBLIC IMPROVEMENT PLANS For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved plan I-2014-004. (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public iprovements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to start of construction. | |
T14PI00006 | Final | 06/30/2014 | 12/10/2014 | PAVING | SIERRA MORADO UNIT 3 PH 1 (Construction Phase 2)) PUBLIC IMPROVEMENT PLANS For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved plan I-2014-004. (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public iprovements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to start of construction. | |
T14PI00008 | Final | 09/03/2014 | 11/02/2015 | PAVING | SIERRA MORADO UNIT 3 PH II Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan I-2014-008 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction. |