Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Permits

Address: 10990 E DREXEL RD
Date - 11/21/2024 11:45 p.m.
Total Number Of Permits - (12)
Permit Status Apply Date Expired Date Unit Type Description
DP13-0239 Complete 12/03/2013 11/01/2020 Development Package TENTATIVE PLAT - SIERRA MORADO UNIT 3 LOTS 01 THRU 173
DP14-0045 Complete 03/26/2014 02/01/2021 Development Package GRADING/SWPPP
DS14-03 Approved 02/11/2014 N/A Zoning Compliance 10990 E DREXEL RD - TSMR 4-02,2.5.B.2 Less than 5% encroachment into PRA.
T06AN01057 ISSUED 10/12/2006 N/A ADDRNEW
T06PL02218 WITHDRWN 12/04/2006 N/A PLUMB PRIVATE SEWER PHASE II
T06PL02219 WITHDRWN 12/04/2006 N/A PLUMB SITE SEWER PHASE I
T13OT01437 FINAL 12/06/2013 N/A FLOODPLN FUP - DP13-0239 and DP15-0043
T14OT01093 FINAL 08/26/2014 N/A FLOODPLN FUP - DP13-0239
T14OT01094 FINAL 08/26/2014 N/A FLOODPLN FUP - DP13-0239
T14OT01095 FINAL 08/26/2014 N/A FLOODPLN FUP - DP13-0239
T14OT01096 FINAL 08/26/2014 N/A FLOODPLN FUP
T15CM01373 EXPIRED 03/02/2015 10/12/2015 COMBO ADD PRE FAB RAMADA FOR SIERRA MARADO

Plans

Address: 10990 E DREXEL RD
Date - 11/21/2024 11:45 p.m.
Total Number Of Plans - (6)
Plan Number Status Application Date Exp Date Unit Type Description
CWH-13-0239 Active 12/03/2013 11/01/2020 -- Commercial Water Harvesting Ordinance TENTATIVE PLAT - SIERRA MORADO UNIT 3 LOTS 01 THRU 173
S14-008 FINAL 03/12/2014 07/31/2019 MINOR SUBDIVISION -- MINS SIERRA MORADO UNIT 3 PHASE I
S14-009 FINAL 03/12/2014 07/31/2019 MINOR SUBDIVISION -- MINS SIERRA MORADO UNIT 3 PHASE II
T14PI00005 FINAL 05/01/2014 12/10/2014 OTHER -- 215 SIERRA MORADO UNIT 3 PH 1 (Construction Phase 1) PUBLIC IMPROVEMENT PLANS For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved plan I-2014-004. (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public iprovements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to start of construction.
T14PI00006 FINAL 06/30/2014 12/10/2014 PAVING -- 205 SIERRA MORADO UNIT 3 PH 1 (Construction Phase 2)) PUBLIC IMPROVEMENT PLANS For the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on city of Tucson approved plan I-2014-004. (all in accordance with Pima County/City of Tucson Standards and Specifications and details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson standard and specifications. Any required special inspections shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public iprovements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson DOT Permit and Codes Section for review prior to start of construction.
T14PI00008 FINAL 09/03/2014 11/02/2015 PAVING -- 205 SIERRA MORADO UNIT 3 PH II Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan I-2014-008 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction.