Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP14-0045
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/01/2016 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by MRUSSO1 - |
07/14/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
03/22/2016 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by MRUSSO1 - 1) SWEEP UP TRACKING FROM TRUCK TRAFFIC ON ADJACENT RAODWAYS. 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
05/08/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - SITE MUST BE IN COMPLIANCE WITH YOUR SWPPP UNTIL THE SITE IS STABILIZED. ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
03/26/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRCTOR WORKING ON STORM WATER DRAINAGE STRUCTURES THROUGHOUT THE SITE. 2) NO SIGNIFICANT STORMWATER CONCERNS AT THIS TIME 3) ENSURE ALL CHANGES AND REVISIONS TO THE ORIGINAL PLANS ARE APPROVED AND PROVIDED FOR FINAL INSPECTION |
03/23/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
03/03/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
02/18/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - ENSURE THE STORM WATER PERMIT IS COMPLIED WITH AND THE APPROVED STORM WATER PLAN IS FOLLOWED |
12/01/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
11/21/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERS AT THIS TIME |
10/09/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE SEDIMENT CONTROLS REMAIN IN PLACE AND ARE MAINTAINED THROUGHOUT CONSTRUCTION. 2) DOCUMENT SELF INSPECTIONS PER YOUR PLAN. 3) SWEEP UP TRACKING AS NEEDED |
08/07/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
07/24/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS ALONG THE REGULATED WASH AT VEHICLE CROSSING ALONG THE SOUTH SIDE OF THE DEVELOPMENT 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 3) ENSURE SEDIMENT CONTROL MAINT IS PERFORMED THROUGHOUT CONSTRUCTION 4) CONTRACTOR STOCKPILING SOIL ALONG SOUTH SIDE OF THE SITE |
07/09/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR HAS INSTALLED SEDIMENT CONTROLS PER THE APPROVED SWPPP 2) AN ENGINEERED DIVERSION BIRM FOR SEDIMENT CONTROL NEEDS TO BE CONSTRUCTED ALONG DEXEL IN ORDER TO PREVENT DISCHARGE OF SOIL FROM THE CONSTRUCTION SITE. 3) ALL SEDIEMNT CONTROLS MUST BE MAINTAINED THROUGHOUT CONSTRUCTION UNTIL THE SITE IS STABILIZED. 4) ENSURE TRACKING OF SOIL IS SWEPT OFF OF ADJACENT ROADWAYS 5) PERFORM AND DOCUMENT ALL STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE. |