Case Details

Status:

COMPLIAN

Type:

EMERGENCY
Address:

Entered Date:

11/06/2019

Applicant:

GOLDEN SOUTHWEST FINANCIAL GROUP ATTN: DALE SCHAUFEL

Description:

COMMUNICATION CALLED THAT T.F.D. ON SITE WITH A BUILDING FIRE, F193100281

Completed Inspections

Case Status: COMPLIAN
Case Number: T19DV08738
Case Description: EMERGENCY
Total Completed Inspections - 2
End Date Description Inspector Results Comments
11/06/2019 INSP - INITIAL CODE ENFORCMENT VIDAL Approved Communication called that T.F.D. on site with a building fire. Arrived and all the units were still on site and the fire was active in the southwest corner of the building. The area was a boiler room and burned into the hallway area to the offices and the kitchen area. The building was sprinklered and the heads went off in the area. Did turn off the valve to the fire system due to the heads were going off and not able to stop the water from coming out. The water main valve shut off was turned off by the water department due to some of the water lines were leaking from the boiler and the water softner. Did have water lines in the hallway area that will need to be checked for fire damage due to has copper pipes with soldering on the fittings. The electrical was removed at the transformer due to the amount of damage to the roof and the plumbing and the electrical in the area. The gas meter was pinned due to the amount of damage and the business will be closed for some time. The fire appeared to be in the ceiling area and the boiler room appears to be where the fire started. The management was on site including the owner of the business. The owner did sign the paperwork on site. The owner was going to secure the building and the building will be in a fire watch.
12/04/2019 INSP - FOLLOW UP CODE ENFORCE VIDAL Approved The property is vacant and secured. Work is being done on the property on correction from the fire. The permit T19CM08289 for the temporary power has been issued on 11-15-19 and finaled on 11-19-19. A permit T19BU00570 for demo has been issued on 11-15-19 and work is still being done. A letter of completion will be done at the end and the permit for the correction will be issued once completed. At this time the case will be closed due to working with the contractors. Violation Abated, Close Case. RV.

Completed Activity Special Conditions

Case Description - EMERGENCY
Case Number - T19DV08738
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 2
Date Name
11/07/2019 NOTICE OF VIOLATION ISSUED
11/07/2019 STRUCTURE SECURED BY ???