Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

MULTIPLE TYPES

Entered Date:

08/11/2017

Applicant:

RPD PROPERTIES - COPPER HOUSE LLLP

Description:

LEAKYU FAUCET, WEEDS, , WETHERSTRIPPING ISSUES AND A BROKEN WINDOW, UNSTABLE WALKWAY ON SECOND FLOOR.

Case Violations

Case Number: T17DV03630
Case Status: COMPLIAN
Case Description: MULTIPLE TYPES
Total Violations: 3
Violation Date Code Statue
08/23/2017 T.C. Ch. 16, Sec. 16-12(c) STAIRWAYS, DECKS AND PORCHES. All stairways, decks and porches shall be maintained in a safe condition and shall be capable of supporting the load and resisting all forces placed thereon by normal use. Every handrail and guardrail shall be firmly fastened and capable of supporting normally imposed loads, and shall be maintained in good condition.
08/23/2017 T.C. Ch. 16, Sec. 16-12(a) EXTERIOR SURFACES. (1) Weather protection. All weather-exposed exterior surfaces of every building, including windows and doors, shall provide weather protection. Every building shall be weather protected to provide shelter for the occupants against the elements and to exclude moisture and dampness.
08/23/2017 T.C. Ch. 16, Sec. 16-11(e) PLUMBING SYSTEMS. (3) All plumbing systems are to be maintained safe and hazard free and in a state of good repair. Every dwelling or dwelling unit shall have an adequate potable water supply. Every plumbing fixture, water and waste-pipe, and gas connection shall be properly installed in accordance with all applicable laws and maintained in good and sanitary working condition so as to prevent structural deterioration or health hazards, and are to be free from leaks and obstructions.

Completed Inspections

Case Status: COMPLIAN
Case Number: T17DV03630
Case Description: MULTIPLE TYPES
Total Completed Inspections - 6
End Date Description Inspector Results Comments
08/22/2017 INSP - INITIAL CODE ENFORCMENT VINDIOLA Approved Arrived on site for initial inspection. Found on second floor by staircase by unit 30 crumbling walkway. Made entry into Unit 23 where occupant showed me leaky faucet to Kitchen bathroom faucet and shower faucets. Shower door railing needed to be cleared out. Both smoke detectors hallway and bedroom not operational. Bedroom window had a crack in it by ADB mark and weatherstripping has been pulled back on the corners allowing moisture to come in.. spoke to manager John on site will make sure the smoke detectors are operational today. Will move to notice of violation for the rest of violations
09/27/2017 NPO - INT. BUILDING MAINTENANC VINDIOLA Approved
09/27/2017 NPO - WEEDS/GRASSES VINDIOLA Approved
09/27/2017 NPO(DL)-DILAPIDATED STRUCTURE VINDIOLA Approved
09/27/2017 NPO(PL)-PLUMBING SYSTEM & FX VINDIOLA Approved
12/06/2017 INSP - FOLLOW UP CODE ENFORCE VINDIOLA Approved Arrived on site and knocked on unit #23 however no answer, called tenant and his is out of town but did speak with him. Nothing has been done from Managers side, called and spoke to Michael Herrideria who stated he would look into issues but thought allwas taken care of. He will check to see if there are any outstanding work orders and speak to maint man and teant. Will follow up early next week

Completed Activity Special Conditions

Case Description - MULTIPLE TYPES
Case Number - T17DV03630
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 6
Date Name
09/27/2017 CONTACTED BY PHONE
09/13/2017 RETURNED MAIL
08/24/2017 CONTACTED BY MAILING
08/23/2017 NOTICE OF VIOLATION ISSUED
02/06/2018 VIOLATION CLOSED
12/06/2017 RESEARCH

Documents

File Name Document Type  
DSCN0493.JPG DOCUMENTS VIEW
DSCN0494.JPG DOCUMENTS VIEW
DSCN0495.JPG DOCUMENTS VIEW
DSCN0496.JPG DOCUMENTS VIEW
DSCN0497.JPG DOCUMENTS VIEW
DSCN0498.JPG DOCUMENTS VIEW
DSCN0499.JPG DOCUMENTS VIEW
DSCN0500.JPG DOCUMENTS VIEW
DSCN0501.JPG DOCUMENTS VIEW