Case: T17DV03607
Case Details
Entered Date:
08/10/2017
Applicant:
SG NATIONAL LLC ATTN: TITUS BRUECKNER & BERRY
Description:
OFFICE CALLED THAT T.P.D. ON SITE WITH A CAR THRU BUILDING
Outstanding Inspections
Case Number: T17DV03607
Case Status: COMPLIAN
Case Description: CAR THROUGH COMMERCIAL BUILDIN
Total Outstanding Inspections - 8
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2017 | EMERGENCY CALL OUT | VIDAL | Item closed | |
| 08/14/2017 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | VIDAL | Item closed | |
| 08/14/2017 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | VIDAL | Item closed | |
| 08/14/2017 | NPO - EGRESS | VIDAL | Item closed | |
| 08/14/2017 | NPO - OTHER | VIDAL | Item closed | |
| 08/14/2017 | NPO - EXT. BUILDING MAINTENANC | VIDAL | Item closed | |
| 08/14/2017 | NPO - WORK WITHOUT PERMIT | VIDAL | Item closed | |
| 08/14/2017 | NPO - INT. BUILDING MAINTENANC | VIDAL | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T17DV03607
Case Description: CAR THROUGH COMMERCIAL BUILDIN
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2017 | INSP - INITIAL CODE ENFORCMENT | VIDAL | Approved | Received call from office that T.P.D. on site with a car through building. Arrived and a truck hit a pole at one address and than drove into the Circle K. The pole was snapped into 3-section and hanging by the wires and T.E.P. was on site for the pole. The Circle K had the truck parked in front and had hit the building where the steel post was located and had a angle change for the glass. 2-section of the glass front was brokened and the glass was on the ground. The steel post has a slight bent where pushed in from the inpact. Did check the top all appears to be OK and no cracks in the drywall were found. Did loose a couple of section of the displays that were in the store where items were hanging in the displays and those were disposed. The store was going to remain opened and once the plywood is placed, the store was going to open. The area was being cleaned while on site. The manager did sign the paperwork. Did talk to the management that at time the steel post could be heated and pulled back into position and that would have to be done with a structual engineer approval. The contractor was on site and will address all the issues to check all the displays beofre placed back into position. A glass company was on site placing the plywood on the window openings. A light pole at the street was touched by the wiring and has burning on the coverplate at the bottom and the light fixtures at the top. Will check on Monday. RV. |
| 08/14/2017 | INSP - FOLLOW UP CODE ENFORCE | VIDAL | Approved | The store was opened and the area has been cleaned up and the openings covered with OSB plywood. All the damaged cabinets that were damaged have been removed from the store. The ATM machines have been relocated back into position. At this time the case will be closed per the administrator Rick Saldate. Violation Abated, Close Case. RV. |
Completed Activity Special Conditions
Case Description - CAR THROUGH COMMERCIAL BUILDIN
Case Number - T17DV03607
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
| Date | Name |
| 08/14/2017 | VIOLATION CLOSED |