Address Search: 1909 E 36TH ST
Search
Parcel Attributes
| Parcel | 130053040 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-1 |
| Tucson Ward | Ward 5 |
| Tucson Registered Neighborhood | Pueblo Gardens |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 1909 E 36TH ST
Date - 08/17/2026 12:48 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 1909 E 36TH ST
Date - 08/17/2026 12:48 a.m.
Total Number Of Permits - (35)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0923-02271 | Inspections Complete | 09/25/2023 | 06/02/2025 | Commercial Building | New Tenant Improvement, merchandising modification and maintenance to existing facility floor plan, store front system and two new entry doors. | |
| TF-FCP-0824-00664 | Complete | 08/12/2024 | N/A | Fire Construction Permit | CO2 Detection System for beverage station | |
| TF-FOP-0824-00916 | Complete | 08/12/2024 | 12/12/2025 | Fire Operational Permit | CO2 Detection System for beverage station | |
| TR-ROW-0823-01052 | Complete | 08/10/2023 | 09/14/2023 | Right-of-Way (ROW) | Geotechnical borings to 5' depth on NWC, NEC and center of intersection at S. campbell ave and E. 36th st. This project is under the Prop. 407 JOC with Kimley-Horn | |
| TR-ROW-0823-01036 | Needs Resubmittal | 08/04/2023 | N/A | Right-of-Way (ROW) | Geotechnical borings to 5' depth on shoulder on NEC and NEC corners and in the center of the intersection | |
| TR-ROW-0823-01030 | Void | 08/02/2023 | N/A | Right-of-Way (ROW) | Geotechnical borings to 5' depth on NWC, NEC and center of intersection at S. campbell ave and E. 36th st | |
| TR-UTL-0425-00645 | Complete | 04/18/2025 | 08/07/2025 | Right-of-Way (ROW) - Utility | Starting at the southeast corner of 1909 E 36th st, Cox to overlash est 371' across 4 poles. | |
| TC-COM-0123-00489 | Complete | 01/17/2023 | 06/03/2024 | Commercial Building | SES Electrical Panel upgrade to 600A BUS, 120/208V, 4 wires, 3 Phase | |
| TC-COM-0123-00421 | Void | 01/05/2023 | 07/04/2023 | Commercial Building | Void-VF-Wrong permit category type submitted. Please submit under Commercial Addition/Alteration Permit. UPGRADE ELECTRICAL SERVICE TO 600A , 120/208V, 3 PH | |
| T02CM02209 | FINAL | 05/01/2002 | 11/20/2002 | COMBO | REPAIR:DISPENSERS | |
| T04OT01276 | FINAL | 06/25/2004 | 05/31/2005 | SIGN | SIGN:#7370 | |
| T07AN00774 | ISSUED | 09/18/2007 | N/A | ADDRNEW | ||
| T07CM03772 | FINAL | 09/18/2007 | 11/01/2008 | COMBO | TI:CIRCLE K STORE # 1449 R1 - Plumbing relocate | |
| T08ME00066 | FINAL | 02/04/2008 | 01/26/2009 | MECH | REPLACE: (2) 5 TON A/C UNITS (APA) | |
| T13CM04064 | VOID | 07/03/2013 | N/A | COMBO | SIGNS | |
| T13CM04789 | FINAL | 08/06/2013 | 10/12/2014 | COMBO | INSTALL LIGHT POLE | |
| T13EX00416 | CLOSED | 03/15/2013 | 05/14/2013 | EXCAV | PLACE ONE ANCHOR NORTH OF POLE 172. P5-343 APA | |
| T13OT00780 | FINAL | 07/03/2013 | 03/17/2015 | SIGN | REPAIR & INSTALL EMC ON DF 21319 | |
| T17CM06358 | FINAL | 08/17/2017 | 04/18/2018 | COMBO | T17DV03607: CAR HIT BUILDING | |
| T17FC00536 | FINAL | 06/30/2017 | 03/12/2018 | FIRECONS | Replace two existing Fuel dispensers with New Gilbarco Encore 700s with new hanging hardware. Hydro Testings existing Dispenser Sumps | |
| T17FO00148 | FINAL | 02/23/2017 | 12/19/2017 | FIREOPER | FLAMMABLE LIQUIDS USED FOR FUEL-DISPENSING | |
| T17OT00989 | FINAL | 09/28/2017 | 06/05/2018 | SIGN | 1-ILLUM DF + 1 CHofC WALL | |
| T17RW03785 | EXPIRED | 08/24/2017 | 11/07/2017 | ROW | TRANSFER OF CTL FACILITIES FROM OLD TO NEW FOREIGN POLES ON WHICH CTL IS A JOINT USE ATTACHEE IN ORDER TO ELIMINATE DOUBLE WOOD POLE SITUATIONS | |
| T18RW01115 | EXPIRED | 03/07/2018 | 06/05/2018 | ROW | TRANSFER OF CTL FACILITIES FROM OLD TO NEW FOREIGN POLES ON WHICH CTL IS A JOINT USE ATTACHEE IN ORDER TO ELIMINATE DOUBLE WOOD POLE SITUATIONS | |
| T19RW04605 | FINAL | 08/23/2019 | 09/22/2019 | ROW | TEP WILL BE REMOVING 1 POLE (#173) IN THE ROW, 2'x2' HOLE 6' DEEP WILL BE BACKFILLED. | |
| T19RW06585 | FINAL | 10/28/2019 | 03/30/2020 | ROW | C TEP to replace/install 22 utility poles, replace/install approx. 4,700' of over head cable, replace/install 9 anchors and one pedestal and excavate/replace approx. 50' of underground cable/conduit. REPLACE/INSTALL APPROX. 4,700' OF OVERHEAD PRIMARY CONDUCTOR BETWEEN wILLITS WAY AND 38TH STEET NOTES: YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 WORK IS BEING DONE ON DOWN CAMPBEL AV WORK CONSIST OF: 1909 E. 36th Street Replace 1 pole 2701 S. Campbell Ave. Replace 2 poles 2357 S. Campbell Ave. Replace 1 pole 2341 S. Campbell Ave. Install 1 pole 2331 S. Campbell Ave. Install 1 pole 1902 S. Campbell Ave. Install 1 pole 2229 S. Campbell Ave. Install 1 pole 2219 S. Campbell Ave. Install 1 pole 2117 S. Campbell Ave. Install 1 pole 2031 S. Campbell Ave. Replace 1 pole 2017 S. Campbell Ave. Install 1 pole 2003 S. Campbell Ave. Install 1 pole 1929 S. Campbell Ave. Install 1 pole 1919 S. Campbell Ave. Install 1 pole 1903 S. Campbell Ave. Replace 1 pole/ Install 1 new pole/ maintenance 3rd pole 1900 S. Campbell Ave Replace 1 pole and 1825 S. Campbell Ave. Install 1 new pole 1950 E. Silverlake Rd. Replace 1 pole and install new piece of ground mounted equipment 1721 S. Cherrybell Stra. Replace 1 pole, Remove 1 pole & Install 1 new pole and anchor 1699 S. Cherrybell Stra. Replace 1 pole and 2 anchors, remove 1 pole 1900 S. Campbell Ave. Replace 1 pole and 2 anchors 1901 S Martin Ave. Replace 1 pole 1750 E. Silverlake Rd. Replace 2 poles (REMOVING 15 POLES INSTALLING 23 NEW POLES ADDING 9 NEW ANCHORS ) | |
| T20RW02197 | FINAL | 04/16/2020 | 12/12/2020 | ROW | TEP to install 7 pullboxes, 6 risers and approx 3,800 linear feet of trenching,conduit and cable NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 Road was restored by the "Prop 409 Residential Streets", any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. | |
| T21CM03321 | WITHDRWN | 04/20/2021 | 10/17/2021 | COMBO | Upgrade electric to 800amp, 3ph, 120/208v | |
| T21FC00295 | FINAL | 04/28/2021 | 11/02/2021 | FIRECONS | Replace Unl(East) fill bucket and install double walled fill bkt | |
| T21RW01646 | FINAL | 04/08/2021 | 06/14/2021 | ROW | Part 1: From the TEP pole at W of 1909 E 36th ST , transfer aerial line to new TEP pole. Part 2: transfer aerial line to new TEP pole. Part 3: Place 3x3 pothole and new COX riser , tie in PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | |
| T97EL00445 | FINAL | 04/23/1997 | 10/27/1997 | ELECT | ELECTRICAL:INSTALL SUMP PAN UNDER DISPENSER | |
| T98CM05528 | EXPIRED | 12/11/1998 | 09/15/1999 | COMBO | REMODEL FACIA | |
| T98EL01571 | EXPIRED | 08/25/1998 | 02/21/1999 | ELECT | ELECTRIC:3 CIRCUITS | |
| T99BU00638 | WITHDRWN | 03/10/1999 | N/A | BUILD | DUMPSTER ENCLOSURE | |
| T99BU00639 | WITHDRWN | 03/10/1999 | 09/25/1999 | WALL/FEN | WALL:32 LF OF 6 |