Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

RES: MINIMUM HOUSING
Address:

Entered Date:

09/22/2015

Applicant:

RUDY MOLINA JR (LECAVE'S BAKERY)

Description:

LEAKING ROOF CEILING TILES AND WATER DAMAGE INNER ROOF

Case Violations

Case Number: T15DV07003
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Violations: 3
Violation Date Code Statue
10/13/2015 T.C. Ch. 16, Sec. 16-12(b)(3) ROOFS. The roof of every building or structure shall be maintained in a safe condition and shall provide weather protection for that building or structure. Roof coverings shall not be rotted, broken, split, buckled or otherwise deteriorated. T.C. Ch. 16, Sec. 16-12(b) FOUNDATIONS, WALLS, ROOFS, AND CHIMNEYS. Every foundation, wall, roof, chimney and all exterior surfaces of buildings and structures shall be maintained in structurally sound condition and shall provide weather protection. All wood showing evidence of termite damage or decay, where structural or functional integrity is impaired, shall be replaced.
10/13/2015 T.C. Ch. 16, Sec. 16-30. GRAFFITI PREVENTION, PROHIBITION AND REMOVAL. (a) Graffiti prohibited, abatement procedures, penalty. No person who owns or is in control of any real property within the city shall maintain, permit or allow graffiti to remain on any building, fence, structure or otherwise on such property where the graffiti is visible from the street or other public or private property. (b) Notice of violation and abatement. Upon the receipt of notice requiring abatement from the graffiti abatement official, any person owning or otherwise being in control of the property shall remove or abate all graffiti within the time frame specified in such notice. The graffiti abatement official shall give notice utilizing the procedures set forth in section 16-45 of this chapter, except that the notice need not include a statement describing the right to an administrative appeal, since none exists. The graffiti abatement official may cause the removal of graffiti from private property should the property owner or person in control fail to remove graffiti after the required notice. The city or its authorized representative is expressly authorized to enter private property and abate graffiti.
10/13/2015 T.C. Ch. 16, Sec. 16-11(f)(5) All interior coverings, finishes, surfaces including walls, ceilings and floors shall be maintained in a good, clean and sanitary condition. Peeling, chipping, flaking or abraded paint shall be repaired, removed or covered. All walls, ceilings or floors shall be free from holes, breaks and loose or rotting materials. Cracked or loose plaster, wallboard, decayed wood or other defective surface conditions shall be corrected.

Outstanding Inspections

Case Number: T15DV07003
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 7
End Date Description Inspector Results Comments
12/11/2015 NPO(EL)-MAIN/PANEL/SUB/DISCONT VIDAL Follow-up inspection
12/11/2015 NPO(EL)-WIRING/SWITCH/OUTLT/FX VIDAL Follow-up inspection
12/11/2015 NPO(PL)-PLUMBING SYSTEM & FX VIDAL Follow-up inspection
12/11/2015 NPO - GRAFFITI VIDAL Follow-up inspection
12/11/2015 NPO - OTHER VIDAL Follow-up inspection
12/11/2015 NPO - EXT. BUILDING MAINTENANC VIDAL Follow-up inspection
12/11/2015 NPO - INT. BUILDING MAINTENANC VIDAL Follow-up inspection

Completed Inspections

Case Status: COMPLIAN
Case Number: T15DV07003
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 2
End Date Description Inspector Results Comments
11/03/2015 INSP - INITIAL CODE ENFORCMENT VIDAL Approved The roof has been repaired and not leaking at this time. The ceiling has not been repaired and has plastered ceilings that has holes and loose in some areas. The graffiti has been removed from the side of the building on the north side. Did go over that the ceiling needs to be patched and at this time remove the loose areas until solid or block off the area not allowing any one in the area. Will check in 10 days. RV.
12/11/2015 INSP - FOLLOW UP CODE ENFORCE VIDAL Approved Met with the owner at site and some work was done to remove the loose areas of the plaster. No patch work has been done but has talk to someone who will be doing the work soon. Will check in 21 days. RV.

Completed Activity Special Conditions

Case Description - RES: MINIMUM HOUSING
Case Number - T15DV07003
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 4
Date Name
10/13/2015 CONTACTED BY PHONE
10/15/2015 CONTACTED BY MAILING
10/15/2015 NOTICE OF VIOLATION ISSUED
09/29/2016 VIOLATION CLOSED

Documents

File Name Document Type  
NOV_1219 S 6TH AVE_T15DV07003.PDF DOCUMENTS VIEW