Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T15DV02968
Case Details
Entered Date:
04/16/2015
Applicant:
MARTHA V MUNOZ& RUBY M MENDEZ JT/RS
Description:
SHED IN BACK OF THIS PROPERTY IS BEING USED AS AN ILLEGAL DWELLING UNIT NO UTILITIES ELECTRIC IS BEING FURNISHED BY THE HOUSE AT THIS PROPERTY THROUGH THE USE OF AN EXTENSION CORD
Case Violations
Case Number: T15DV02968
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Violations: 2
Violation Date | Code Statue |
---|---|
04/16/2015 | T.C. Ch. 16, Sec. 16-4. PERMITS REQUIRED. Unless otherwise exempt pursuant to section 301 of the Administrative Code, as adopted by reference per section 6-1 of this Code, or pursuant to any other ordinance or statute, no building, structure or building service equipment regulated by this chapter or by the technical codes adopted by the city shall be built, erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a permit first has been obtained from the building official in the manner provided in the administrative and building codes adopted by the city. The purpose of a permit is to ensure that all construction is inspected by qualified City of Tucson personnel as directed by ordinance to verify compliance with city codes. Failure to obtain proper permit with inspections and approvals shall deem the construction to be unsafe. |
04/16/2015 | T.C. Ch. 16, Sec. 16-11(c) ELECTRICAL SYSTEM. (1) All dwellings and dwelling units shall be provided with electrical service. Electrical facilities connected to or in any building or structure are to be maintained hazard-free and in a state of good repair. The electrical system shall be free from such hazards as bare wiring; overloaded circuits or services; equipment not properly grounded; over-fused circuits; misuse of wiring, including the use of extension cords in lieu of permanent wiring; non-approved wiring; and wiring exposed to moisture or extreme heat. Broken, loose, frayed, inoperable, defective or missing portions of the electrical service, lines, switches, outlets, fixtures and fixture coverings shall be repaired or replaced. (2) All electrical equipment, wiring and appliances shall be installed and maintained in a safe manner and in accordance with all applicable laws. |
Outstanding Inspections
Case Number: T15DV02968
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 7
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/16/2015 | NPO(PL)-PLUMBING SYSTEM & FX | SMITH | Item closed | |
04/16/2015 | NPO(PL)-GAS SUPPLY/CONNECT | SMITH | Item closed | |
04/16/2015 | NPO(PL)-SEWAGE DISPOSAL (SYS) | SMITH | Item closed | |
07/02/2015 | LUC - ILLEGAL DWELLING UNIT | MMENDOZA | Item closed | |
07/02/2015 | NPO(EL)-MAIN/PANEL/SUB/DISCONT | MMENDOZA | Item closed | |
07/02/2015 | NPO(EL)-WIRING/SWITCH/OUTLT/FX | MMENDOZA | Item closed | |
07/02/2015 | NPO - WORK WITHOUT PERMIT | MMENDOZA | Item closed |
Completed Inspections
Case Status: COMPLIAN
Case Number: T15DV02968
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 2
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/16/2015 | INSP - INITIAL CODE ENFORCMENT | SMITH | Approved | Inspection found a shed being used as an illegal dwelling. Found a number of issues with the property. Work without permit for two shed one on the Southeast side of the property, and one that was bing used as an illegal dwelling unit. There was a number of issued with extension cords being used for power for light and other items that needed power. It looks like two sub panel have been added without permit along with power being ran from the top of the roof to another shed that has been them from photoes before 1998. Sopke to one of the owner (Ruby) and I explioned to her that she could not live in the shed that it was unsafe for her or anyone to live there. I gave her a Notice of emergency abatement and order to vacate. and a Notice of Violation for work without permit building that was built without a permit. I explained to her that I would send her another notice for the rest of the violations. Did give her 30 Days to get a permit for the building or remove the building. |
07/02/2015 | INSP - FOLLOW UP CODE ENFORCE | MMENDOZA | Approved | Illegal dwelling and remainder of personal storage removed, electrical over head feeders removed from dwelling to main house. violations abated -CLOSE CASE |
Completed Activity Special Conditions
Case Description - RES: MINIMUM HOUSING
Case Number - T15DV02968
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 5
Date | Name |
04/16/2015 | CONTACTED IN PERSON |
04/29/2015 | CONTACTED BY MAILING |
04/16/2015 | NOTICE AND ORDER ISSUED |
04/16/2015 | NOTICE OF VIOLATION ISSUED |
09/17/2015 | VIOLATION CLOSED |