Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel137040320
JurisdictionTucson
City of Tucson ZoningR-2
Tucson WardWard 5
Tucson Registered NeighborhoodSunnyside
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 5371 S 6TH AV
Date - 11/15/2024 1:43 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Permits

Address: 5371 S 6TH AV
Date - 11/15/2024 1:43 a.m.
Total Number Of Permits - (4)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1222-00169 Complete 12/19/2022 02/04/2023 Right-of-Way (ROW) Air-Vacuum Excavation of 42 Utility Potholes approximately 12"x12" in size for the design phase of Tucson Water Project CIP No W961 Rodeo Addition Main Replacement Phase 2
TC-RES-1023-08872 Complete 10/17/2023 10/29/2024 Residential Building - One or Two Family Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.
T15CM02613 EXPIRED 04/20/2015 10/28/2015 COMBO (T15DV02968) DEMO SLEEPING QUARTER AND RAMADA
T16RW02028 FINAL 10/14/2016 12/09/2016 ROW (2) 5X5 BELLHOLES IN DIRT ALLEY IN REAR OF PROPERTY TO REPLACE GAS LINE

Record Requests

Address: 5371 S 6TH AV
Date - 11/15/2024 1:43 a.m.
Total Number Of Requests - (1)
Request Number Status Request Date Completed Date Type Description
REQ-0424-03103 Complete 04/23/2024 05/13/2024 Requests 90 DAYS EXTENTION REQUIRED AS PAVING WORK DID NOT ALLOW US TO BE AT JOB SITE Installation of new Private water service line from the Meter to 10' outside of the house (house Connection) part of Rodeo addition phase 2 TW project. The water line will be a 1-inch pex, buried at 14 inches. 12awg tracer wire will be taped to the pex every ten ft. from the new meter to the tie-in point. The new 5/8 meter will have a 1-inch meter valve installed on the customer's side.