Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Case: T06DV00624
Case Details
Entered Date:
06/08/2006
Applicant:
RIO NUEVO MULTIPURPOSE FACILITIES DISTRICT
Description:
NO AIR CONDITIONING
Outstanding Inspections
Case Number: T06DV00624
Case Status: COMPLIAN
Case Description: RES: MINIMUM HOUSING
Total Outstanding Inspections - 1
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
EMERGENCY CALL OUT | None | Not Inspected |
Completed Inspections
Case Status: COMPLIAN
Case Number: T06DV00624
Case Description: RES: MINIMUM HOUSING
Total Completed Inspections - 3
End Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/08/2006 | INSP - INITIAL CODE ENFORCMENT | GGOODMAN | Approved | MET AT RIO NUEVO MULTI PURPOSE FACILITY, PRESENT WERE: JEFF LEACH, TFD, DINO RAMIREZ, TFD, ERNIE DUARTE, DSD, ELISEO GARZA, DNR, RICHARD DRAVES, DNR, RICK SALDATE, DNR; OWNER DON BIGGERS, AN ASSISTANT TO MR BIGGERS, AND MYSELF. A VIOLATION WAS ISSUED BY DINO RAMIREZ, PRESENT FOR A CONCERT ON 6/2/06. PROBLEMS WERE HEATING, OVER SEATING EXITS BEING BLOCKED, AND POSSIBLE PROBLEM WITH FESTIVAL STYLE SEATING. E DUARTE MENTIONED HE WAS PRESENT AT THE VENUE AND ALL CLAIMS WERE VALID. NEXT VENUE TO BE TODAY 6/8/06 ONLY 500-600 PEOPLE ARE TO ATTEND, 1/2 THE AMOUNT PRESENT FOR 6/6/06 VENUE OF 1200 PEOPLE. DSD HAS NOT YET ISSUED PERMIT, IN REVIEW PROCESS, BEING HELD UP BY WILDAN ON REVIEW. AL NICHOLS ENGINEERING SUBMITTED PRINTS A WEEK AGO BEGAN AND QUIT WORKING DUE TO NO PRINTS. E DUARTE MENTIONED HE WOULD TRY TO EXPEDITE THE PROCESS. MR GARZA MENTIONED THEY (THE CITY) DID NOT INTEND ON SHUTTING DOWN THE RIALTO, BUT WANTED TO MAKE SURE THE HEATING/COOLING WAS CORRECTLY ADDRESSED AND THAT TFD ISSUES WERE ALSO PROPERLY ADDRESSED. MR BIGGERS MENTIONED THAT ACM OWNER STEVE RODGERS AND ENGINEER AL NICHOLS WERE WAITING AT THE RIALTO THEATER TO GO OVER A/C PLANS. GROUP MEETING MOVED TO THE RIALTO THEATER. WE WERE MET BY STEVE RODGERS, AL NICHOLS, AND HYMAN KAPLAN. AL NICHOLS WENT OVER HEATING/COOLING PLAN, BASICALLY A 3 PHASE SYSTEM HAS BEEN SUBMITTED FOR NEW A/C SYSTEM THE 1ST PHASE ADDRESSING THE MAIN FLOOR AREA, HE FELT SUFFICIENT BUT IF THE SYSTEM WAS NOT ENOUGH, THE 2ND PHASE WOULD BE IMPLEMENTED TO INCLUDE THE BALCONY AREA, IF PHASE 1 & 2 STILL NOT ENOUGH, PHASE 3 TO INCLUDE THE STAGE WOULD BE INSTALLED LATER. STEVE RODGERS MENTIONED THAT HE PRESENTLY HAS BEEN WORKING WITHOUT A PERMIT BUT STOPPED WORK, EXPLAINED IF A PERMIT WAS NOT ISSUED RIGHT AWAY, THE A/C WOULD NOT BE READY FOR THE NEXT MAJOR VENUE ON 6/21/06. ERNIE DUARTE GAVE MR RODGERS THE OK TO CONTINUE WORK ON THE A/C SYSTEM AND MENTIONED "WE WILL ALLOW THE PERMIT TO CATCH UP WITH THE WORK PROCESS." STEVE RODGERS MENTIONED THAT BEING ALLOWED TO CONTINUE, HE SHOULD HAVE ALL EQUIPMENT & DUCT WORK INSTALLED BY END OF NEXT WEEK, READY TO FIRE UP. ERNIE MENTIONED HE WOULD HAVE OR MAKE INSPECTORS READILY AVAILABLE TO INSPECT WORK IN PROGRESS. STEVE RODGERS MENTIONED UNITS WOULD BE WORKING BEFORE THE 24TH OF JUNE. MR BIGGERS IS IN THE PROCESS OF SATISFYING TFD. NO MENTION TO ME YET WHAT THE OUTCOME EXCEPT THAT TFD HAS REQUIRED THEIR PRESENCE AT THE NEXT VENUE WITH COST TO THE OWNER. WILL FOLLOW UP WITH DINO RAMIREZ. STEVE RODGERS TOOK ME TO INSPECT THE ROOF UNITS (EXISTING). THERE WERE 3 LARGE COOLERS EXISTING ON THE ROOF. STEVE OPENED UP THE COOLER & EXPLAINED THAT UNITS WERE ACTUALLY WORKING AT 1/8 THEIR CAPACITY DUE TO LOOSE BELT ON COOLER; MOTOR WAS WORKING PROPERLY - LOOSE BELT FROM MOTOR TO SQUIRREL CAGE WAS SLIPPING & NOT ALLOWING CAGE TO TURN AT A FASTER CAPACITY ULTIMATELY NOT ALLOWING BLOWER TO BLOW MORE AIR OR THE CURRENT AMOUNT OF AIR. PUMPS WERE WORKING CORRECTLY. COOLER POSITIONED ON THE EAST SIDE OF ROOF WAS BLOWING MORE AIR THEN COOLER TO THE WEST. WAS NOT ABLE TO GET TO THIRD COOLER DUE TO LACK OF LADDER, BUT AIR WAS BEING PUSHED OUT TO THE BALCONY AREA & COULD BE FELT WHEN INSIDE THE BALCONY. STEVE RODGERS MENTIONED THAT A FULL CREW WOULD BE ONSITE TOMORROW 6/9/06 TO BEGIN THE COMPLETION OR REMAINDER OF THE WORK. NO NOV WAS ISSUED AT THIS TIME. *INTERIOR OF THE STRUCTURE WAS FOUND TO BE QUITE WORN WITH THE 3 EXISTING COOLERS. 2 ADDITIONAL COOLERS WERE ADDED AT 6/6/06 VENUE & MAY BE USED TONIGHT 6/8/06. PICTURES WERE TAKEN. |
06/22/2006 | INSP - FOLLOW UP CODE ENFORCE | GGOODMAM | Approved | VISITED SITETOOK INSPECTOR JERRY ORTA TO GO OVER ELECTRICALAND TO EXPLAIN TO ME ALL PORTIONS OF ELETRICAL. UPON ARRIVAL FOUND DSD ON SITE TO INSPECT THE ELECTRICAL.DSD INSPECTOR CHARLIE CLEMONS DID FIND SECERAL ISSUES REJECTED THE INSPECTION. INSPECTION WAS RE-CALLED FOR TOMORROW 6/23. SABINO ELECTRIC MIKE BARNES MENTIONED ALL CORRECTIONS WIL BE MADE AND READY FOR THE FOLLOWING DAY TEP WALTER YOSIN WAS ON SITE TO ALSO EXPLAINED TO SABINO WAHT WAS NEEDED FOR TEP TO TURN ON POWER. * STEVE ROGERS TOOK ME UP TO ONE OF THE AIR HANDLERS AND SHOWED ME A CRACK IN ONE OF THE COILS MENTIONED CRACK WAS FOUND WHEN TRYING TO CHARGE THE LINES, PROBOBLY CRACKED DURING SHIPPING STEVE MENTIONED THEY WOULD WELD THE CRACK AND REORDER THE PART REINSTALL AT A LATER DATE. NO PICTURES TAKEN. DSD REPORT WILL BE IN FILE. WILL FOLLOW UP WITH RICH DAVES BY E-MAIL. 06/23/06 VISITED SITE, MET MIKE BARNES SABINO ELECTIRC , AND CHARLIE CLEMONS DSD. CHARLIE CLEMONS RE-INSPECTED THE ELECTRICALAND FOUND MOST ISSUESFOUND N 6/22 HAD BEEN CORRECTED AND WAS ASKING SOME OTHER MINOR ISSUES BE CORRECTED AGAIN TODAY. INITIALLY MIKE BARNES BECAME VERY UPSET, SETTLED DOWN AND MADE SURE ALL CORRECTIONS GET COMPLETED. SABINO ALREADY STARTED MAKING CORRECTIONS TEP WAS ON SITE TO CONNECT POWER. CHARLIE HAD OKED POWER AND MENTIONED HE WOULD BE BACK ON MONDAY 6/26 TO RE-INSPECT. SPOKE WITH STEVE ROGERS TO FIND OUT WHEN OR IF HE HAD CALLED FOR INSPECTIONS. STEVE MENTIONED MENTIONED HE WOULD NOT CALL UNTILL NEXT WEEK. STILL CONFIDENT UNIT WILL BE FIRED UP TODAY. *RETURNED TO OOFICE UPDATED ELISCO AND DRAVES BY E-MAIL WILL RETURN THIS PM TO BE SURE WORK IS COMPLETED.DSD INSPECTION REPORT IN CASE FILE. |
06/22/2006 | INSP - FOLLOW UP CODE ENFORCE | GGOODMAN | Approved | VISITED SITE, CHECKED WITH SABINO ELECTRIC SUPERINTENDENT, BOBBY, WHO MENTIONED SABINO WOULD BE COMPLETING THE ELECTRICAL TODAY BY THE END OF THE BUSINESS DAY. SERVICE PANEL FROM THE PEDESTEL WAS BEING INSTALLED AT THE TIME OF INSPECTION & VERY NEAR COMPLETION. SPOKE WITH MARTY OF ACM WHO MENTIONED THE PLUMBING OR PIPING WAS GOING SLOW, BUT HE EXPECTED TO HAVE THE EAST SECTION COMPLETED & WOULD BE STARTING THE 2ND OR WEST SECTION THIS AFTERNOON. AN ADDITIONAL PERSON WAS HELPING MARTY WITH THE PLUMBING & 2-3 MORE PEOPLE HELPING SET THE DUCT WORK ALSO MOVING ALONG SLOWER THAN EXPECTED. WILL FOLLOW UP LATE THIS AFTERNOON FOR PROGRESS CHECK. FEW PICTURES WERE TAKEN. |
Completed Activity Special Conditions
Case Description - RES: MINIMUM HOUSING
Case Number - T06DV00624
Case Status: COMPLIAN
Total Completed Case Activity Conditions: 1
Date | Name |
12/22/2006 | VIOLATION CLOSED |