Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case Details

Status:

COMPLIAN

Type:

COM: FIRE

Entered Date:

12/07/2001

Applicant:

TURBO AIRE HOLDINGS INC

Description:

FIRE

Outstanding Inspections

Case Number: T01VL03131
Case Status: COMPLIAN
Case Description: COM: FIRE
Total Outstanding Inspections - 1
End Date Description Inspector Results Comments
12/06/2001 INITIAL CODE VIOLATION JORTA Correction Required EMERGENCY CALL OUT OK TO RE ENERGISE ONCE ELECTRICAL K-11 OR C-11 CONTRACTOR HAS MADE SAFE. CORRECTION AND DAMAGE REPAIR TO WIRING AS FOLLOWS. 1.) ROMEX WIRE CUT AT TOP OF ROOF JOIST. MAKE PROPER ACCESIBLE REPAIR AND REMOVE ROMEX FROM TOP OF ROOF JOIST (UNPROTECTED FROM SUBJECT PHYSICAL DAMAGE.) 2.) JUNCTION BOX IN HALLWAY MUST BE MADE ACESSIBLE BY ANY CODE MEANS 3.) IMPROPER SINGLE CONDUCTOR WIRING OF EXIST FLUORESCENT FIXTURE ABOVE CEILING NOT USED PLEASE DISCONNECT AT SOURCE. 4.) ELECTRICAL CONTRACTOR TO OBTAIN A 1HR. ELECTRICAL REPAIR PERMIT AND CALL FOR FINAL. FU. 1/4/02

Completed Inspections

Case Status: COMPLIAN
Case Number: T01VL03131
Case Description: COM: FIRE
Total Completed Inspections - 1
End Date Description Inspector Results Comments
01/04/2002 FOLLOW UP CODE VIOLATION JORTA Approved A FINAL HAS BEEN APPROVED ON A GENERAL REPAIR PERMIT. PLEASE CLOSE OUT.

Documents

File Name Document Type  
None DOCUMENTS VIEW