Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 1000 E VALENCIA RD
Search
Annexations & Original City Zoning (OCZ)
Address: 1000 E VALENCIA RD
Date - 11/26/2024 10:35 a.m.
Total Number Of Annexations & Original City Zoning (2)
Permits
Address: 1000 E VALENCIA RD
Date - 11/26/2024 10:35 a.m.
Total Number Of Permits - (14)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-1023-01250 | Complete | 10/12/2023 | 11/19/2023 | Right-of-Way (ROW) | Right of Way, Traffic Control for the El Tour de Tucson 2023 Traffic Control setup/take down Friday, 11/17/203 Saturday, 11/18/2023 | |
TR-UTL-0923-02591 | Issued | 09/27/2023 | 12/02/2023 | Right-of-Way (ROW) - Utility | RE: Expired Permit TR-UTL-0723-02014: WO T65857. TEP will be removing 1 pole in the ROW. | |
TR-UTL-0723-02014 | Complete | 07/13/2023 | 09/25/2023 | Right-of-Way (ROW) - Utility | WO T65857. TEP will be removing 1 pole in the ROW. | |
T21RW02697 | Complete | 06/03/2021 | 07/03/2021 | Right-of-Way (ROW) | Install vehicle detector on traffic signal mast arms. Work will take less than 30 minutes per occurr | |
T01CM05928 | FINAL | 12/06/2001 | 06/17/2002 | COMBO | GENERAL REPAIR:FIRE DAMAGE | |
T02AN00693 | ISSUED | 07/30/2002 | N/A | ADDRNEW | ||
T02EL01468 | FINAL | 07/17/2002 | 03/02/2003 | ELECT | REWIRE:HANGAR | |
T16EX00683 | FINAL | 03/03/2016 | 05/03/2016 | EXCAV | Geotechnical borings (Vertical) at 5 locations on Valencia Road with soil sampling to a depth of 3 feet between Nogales Highway and Campbell Avenue. | |
T16TC00545 | EXPIRED | 03/03/2016 | N/A | BARRICAD | Geotechnical borings (Vertical) at 5 locations on Valencia Road with soil sampling to a depth of 3 feet between Nogales Highway and Campbell Avenue. | |
T18RW00352 | FINAL | 01/19/2018 | 02/22/2018 | ROW | PLANTING TALL POT TREES IN MEDIANS ON VALENCIA RD FROM PARK AVE TO TUCSON BL | |
T21RW01597 | FINAL | 04/06/2021 | 05/08/2021 | ROW | JOB ORDER CONTRACT FOR TRAFFIC SIGNAL AND STREET LIGHT CONSTRUCTION, CONTRACT NO. 181906-02 REWIRING THE INTERSECTION OF PARK AV AND VALENCIA ROAD. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. | |
T21RW05092 | FINAL | 11/29/2021 | 01/05/2022 | ROW | PERFORM 2 VERTICAL BORINGS IN THE TUCSON ROW TO AN APPROXIMATE DEPTHS OF 5 FEET BELOW EXISTING GRADE WITH AUGER THAT IS 8 INCHES IN DIAMETER. THE WORK IS BEING PERFORMED FOR WSP USA INC (PM: Jose Aguilar, PE, ENV SP) WORKING FOR TAA. BASED ON PIMA MAPS THE COT ROW INCLUDES BORINGS P-1 and P-2 WILL BE PERFORMED IN THE ROADWAY (SEE ATTACHED PLAN). BORINGS WILL REQUIRE ONE SINGLE LANE CLOSURE USING FLAGGERS WITH APPROPRIATE SIGNAGE FOR TRAFFIC CONTROL. EACH LOCATION WILL TAKE APPROXIMATELY 30 MINUTES TO AN HOURS TO COMPLETE. BORING WILL BE BACKFILLED WITH COMBINATION WITH SOIL CUTTINGS AND CONCRETE AND THE SURFACE WILL BE PATCHED WITH ASPHALT. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 8. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 9. MAINTAIN PEDESTRIAN ACCESS 10. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW05250 | FINAL | 12/13/2021 | 02/02/2022 | ROW | TEP WILL BE REMOVING 1 POLE IN THE ROW A 2'X2' HOLE 6' DEEP WILL BE BACKFILLED WITH/OUT SIDEWALK IMPACT. START DATE PUSHED BACK DUE TO HOLIDAY RESTRICTIONS. ADDRESS ON APP IS 990 E VALENCIA RD PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF PRECONSTRUCTION MEETING NOTE: E VALENCIA RD IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2" MILL AND OVERLAY FOR 50' IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 5. MAINTAIN PEDESTRIAN ACCESS 6. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 | |
TUC-22453 | RENEWAL | 09/24/1997 | 06/01/1997 | VESSEL |