Case: CE-VIO0926-03742
Case Details
Status:
Notice of Violation
Type:
PMMULT/ no power to units, no fridge, roof water leak, roaches all around, weeds up to knees on property
Address:
Entered Date:
09/08/2026
Applicant:
N/A
Description:
Completed Inspections
Case Status: Notice of Violation
Case Number: CE-VIO0926-03742
Case Description: PMMULT/ no power to units, no fridge, roof water leak, roaches all around, weeds up to knees on property
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2026 | COT - ENFC - Code Enforcement - Initial | In Violation | Property has a severe insect infestation. While inside I witnessed hundreds of insects coming from the walls, floors, and ceilings. The smoke detectors do not work, the AC vents are falling off the wall and being held up by duck tape, and there is visible water damage in the kitchen ceiling. The tenant stated that when it rains the leak is so bad it floods her kitchen. there is overgrown vegetation throughout the front of the unit. | |
| 11/03/2026 | COT - ENFC - Code Enforcement - Follow Up | In Violation | Property has been provided with landscaping, smokedetectors, and ongoing pest control. Still outstanding are the A/C vents, the ceiling damage, the addition of a stove (including a fan or replacement vent), roof repairs and necessary permits for such repairs. The new property management indicated that allof the violations with exception of the roof will be repaired by 11/16. I explained that if that is the case I would provide more time tosecure bids for a new roof however, I would not be willing to extend the timeline indefinetly due to the dire need for a roof repair. He understood and will convey that to the owner of the property. |
Scheduled Inspections
SCase Number - CE-VIO0926-03742
Case Status: Notice of Violation
Case Description:
| Scheduled Date | Description | Inspector | Status |
|---|---|---|---|
| 11/16/2026 | COT - ENFC - Code Enforcement - Follow Up | Scheduled |