ZRES / Unit 27 / Trailer is running gas generator 24/7 for the past 3 months causing nuisance to neighboring homes / possible to electricity
Address:
Entered Date:
09/21/2023
Applicant:
N/A
Description:
Completed Inspections
Case Status: Closed - Resolved
Case Number: CE-VIO0923-05673
Case Description: ZRES / Unit 27 / Trailer is running gas generator 24/7 for the past 3 months causing nuisance to neighboring homes / possible to electricity
Total Completed Inspections - 2
| End Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2023 | COT - ENFC - Code Enforcement - Initial | Passed | VISITED SITE, MET WITH MAINTANENCE AND MANAGER ON SITE, THEY STATED THAT THEY HAD 5 TRAILERS THAT WEREWITHOUT POWERTHEY CONTACTED TEP TO COMEOUT AND CHECK THE MAIN 3 PHASE SYSTEM AND FOUND THE ISSUE WAS NOT WITH THEIR SIDE OF THE SYTEM EVERYTHING WAS GOOD ON THE TEP SIDE. MANAGER HAD TO PUT THE TENANTS UP IN HOTELS FOR THE NIGHT, THEY CONTACTED SEVERAL ELECTRICAL COMPANIES TO CHECK THE MASTER METER SYSTEM AND GIVE THEM A BID. IN THE MEAN TIME THEY CONTACTED GEN TEC WHO PROVIDED A GENERATOR THAT WOULD FEED POWER TO ALL FIVE UNITS. GEN TEC COMES UT TWICE A WEEK TO FILL THE GENERATOR WITH GAS AND MAINTAINS THE GENERATOR EVERY 10 DAYS. OWNERS LATER ACCEPTED A BID FROM FLAT IRON ELECTRIC OUT OF PHOENIX, I CONTACTED RENEE AT THE CORPORATE OFFICE WHO CONFIRMED THEY WOULD BE DOING THE WORK AND STATED BEFORE THEY CAN GET THEIR PERMIT FOR THE WORK THEY NEED TO GET A ELECTRICAL ENGINEER(ERIC HARDWICK) TO DETERMINE OR MAP OUT HOW POWER IS BEING FED TO 4 TRANSFORMERS WITH IN THE PARK AND WHAT UNITS AND THEY WILL START ON MONDAY 9/25, SHOULD BE DONE BY 9/27. ONCE ENGINEER HAS EVERYTHING ON PLANS THEY WILL SUBMIT PLANS TO PDSD FOR APPROVAL. OCCUPANTS ARE BEING INFORMED WHEN GEN TEC IS COMING OUT TO CHECK THE GENERATOR AND MAKE ANY NECCESARY REPAIRS AS POWER WILL BE DOWN FOR I MAYBE 2 HOURS. WORK IS IN PROGRESS, I WILL FOLLOW UP WITH CORPORATE FOR FLAT IRON ELECTRIC AND SERVICE COORDINATOR ON 10/04/2023 | |
| 01/29/2024 | COT - ENFC - Code Enforcement - Follow Up | Passed | VISITED SITE, MET WITH MANAGER AND MAINTANENCE WHO INFORMED ME THAT THE BID FROM FLAT IRON ELECTRIC ELECTRIC IN PHOENIX INCLUDED RERUNNING ALL ELECTRIC TO THE MHP GRID AND WAS WAY OVERPRICED. A ELECTRICIAN OUT OF APACHE JUNCTION ENDED UP FINDING THAT 4 OF THE MOBILE HOMES WERE WIRED TOGETHER BY A PREVIOUS ELECTRICIAN, 4 SERVICE PANELS LINKED TO ONE PANEL . ELECTRICIAN REMOVED THE LINKED PANELS, RAN ELECTRICAL THRU A SLEAVE AND RAN EACH UNIT TO THEIR SEPERATED PEDESTALS. THE GENERATOR WAS THEN REMOVED. THERE WERE NO FURTHER ISSUES. COMPLIANCE / CLOSE CASE |