Inspection Status: Passed
Inspection History: COT - ENFC - Code Enforcement - Follow Up
| Date |
Description |
Inspector |
Results |
Comments |
| 01/29/2024 |
COT - ENFC - Code Enforcement - Follow Up |
|
Passed |
VISITED SITE, MET WITH MANAGER AND MAINTANENCE WHO INFORMED ME THAT THE BID FROM FLAT IRON ELECTRIC ELECTRIC IN PHOENIX INCLUDED RERUNNING ALL ELECTRIC TO THE MHP GRID AND WAS WAY OVERPRICED. A ELECTRICIAN OUT OF APACHE JUNCTION ENDED UP FINDING THAT 4 OF THE MOBILE HOMES WERE WIRED TOGETHER BY A PREVIOUS ELECTRICIAN, 4 SERVICE PANELS LINKED TO ONE PANEL . ELECTRICIAN REMOVED THE LINKED PANELS, RAN ELECTRICAL THRU A SLEAVE AND RAN EACH UNIT TO THEIR SEPERATED PEDESTALS. THE GENERATOR WAS THEN REMOVED. THERE WERE NO FURTHER ISSUES. COMPLIANCE / CLOSE CASE |