Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: COT - ENFC - Code Enforcement - Initial

Case Number - CE-VIO0923-05673

Inspection Description - COT - ENFC - Code Enforcement - Initial

Inspection Status - Passed

Date Description Inspector Results Comments
09/22/2023 COT - ENFC - Code Enforcement - Initial Passed VISITED SITE, MET WITH MAINTANENCE AND MANAGER ON SITE, THEY STATED THAT THEY HAD 5 TRAILERS THAT WEREWITHOUT POWERTHEY CONTACTED TEP TO COMEOUT AND CHECK THE MAIN 3 PHASE SYSTEM AND FOUND THE ISSUE WAS NOT WITH THEIR SIDE OF THE SYTEM EVERYTHING WAS GOOD ON THE TEP SIDE. MANAGER HAD TO PUT THE TENANTS UP IN HOTELS FOR THE NIGHT, THEY CONTACTED SEVERAL ELECTRICAL COMPANIES TO CHECK THE MASTER METER SYSTEM AND GIVE THEM A BID. IN THE MEAN TIME THEY CONTACTED GEN TEC WHO PROVIDED A GENERATOR THAT WOULD FEED POWER TO ALL FIVE UNITS. GEN TEC COMES UT TWICE A WEEK TO FILL THE GENERATOR WITH GAS AND MAINTAINS THE GENERATOR EVERY 10 DAYS. OWNERS LATER ACCEPTED A BID FROM FLAT IRON ELECTRIC OUT OF PHOENIX, I CONTACTED RENEE AT THE CORPORATE OFFICE WHO CONFIRMED THEY WOULD BE DOING THE WORK AND STATED BEFORE THEY CAN GET THEIR PERMIT FOR THE WORK THEY NEED TO GET A ELECTRICAL ENGINEER(ERIC HARDWICK) TO DETERMINE OR MAP OUT HOW POWER IS BEING FED TO 4 TRANSFORMERS WITH IN THE PARK AND WHAT UNITS AND THEY WILL START ON MONDAY 9/25, SHOULD BE DONE BY 9/27. ONCE ENGINEER HAS EVERYTHING ON PLANS THEY WILL SUBMIT PLANS TO PDSD FOR APPROVAL. OCCUPANTS ARE BEING INFORMED WHEN GEN TEC IS COMING OUT TO CHECK THE GENERATOR AND MAKE ANY NECCESARY REPAIRS AS POWER WILL BE DOWN FOR I MAYBE 2 HOURS. WORK IS IN PROGRESS, I WILL FOLLOW UP WITH CORPORATE FOR FLAT IRON ELECTRIC AND SERVICE COORDINATOR ON 10/04/2023