Address Search: 8800 E SPEEDWAY BL
Search
Parcel Attributes
| Parcel | 13335002U |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-2 |
| Tucson Ward | Ward 2 |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 8800 E SPEEDWAY BL
Date - 12/16/2025 10:01 a.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 12/16/2025 10:01 a.m.
Total Number Of Rezone Cases - (2)
| Case No. | Description | New Zone | Status | Status Date |
|---|---|---|---|---|
| C9-71-30 | Ervin - Bedford Drive | R-4 | Effectuated | 10/06/2011 |
| TP-ENT-0223-00015 | Speedway Self-Storage Rezoning | C-2 | Ordinanced | 02/20/2023 |
Permits
Address: 8800 E SPEEDWAY BL
Date - 12/16/2025 10:01 a.m.
Total Number Of Permits - (33)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-1224-02407 | Complete | 12/23/2024 | 04/13/2025 | Right-of-Way (ROW) - Utility | PRJ238495-1 COX TO PULL 408' OF FIBER THROUGH EXISTING CONDUIT, TRENCH 30' TO INSTALL CONDUIT AND PLACE VAULT FOR SYSTEM TIE. | |
| TR-UTL-1224-02324 | Complete | 12/09/2024 | 01/22/2025 | Right-of-Way (ROW) - Utility | ROW permit to finish TEP work in the property right of way. | |
| TF-FCP-1224-01029 | Complete | 12/04/2024 | 12/11/2025 | Fire Construction Permit | New fire alarm system into a self storage | |
| TR-ROW-1024-01276 | Complete | 10/31/2024 | 02/05/2025 | Right-of-Way (ROW) | ROW Permit for Sewer Utility Connection for property/site. 11/12/2024 Revised: Traffic control set up and work hours approved for 7:00am - 5:00pm. | |
| TR-UTL-1024-02077 | Complete | 10/30/2024 | 12/06/2024 | Right-of-Way (ROW) - Utility | EXCAVATING APPROX 190' TRENCH AT 8800 E SPEEDWAY BLVD TO REPLACE GAS MAIN IN ROW IN DIRT. TRENCH WILL BE LOCATED APPROX 25' NORTH OF NORTH P/L. | |
| TR-ROW-1024-01201 | Complete | 10/14/2024 | 10/21/2025 | Right-of-Way (ROW) | Fence permit for work in ROW that does not require barricades or impedge pedestrian sidewalk traffic. (Permit Approved for 24 hr placement of Fencing behind the edge of Sidewalk, ONLY) | |
| TR-UTL-1024-01961 | Complete | 10/11/2024 | 12/20/2024 | Right-of-Way (ROW) - Utility | Lowering TEP conduits at property to avoid conflict with water and sewer install at the property. | |
| TR-ROW-1024-01184 | Withdrawn | 10/09/2024 | N/A | Right-of-Way (ROW) | Wet and dry utilities for: Water Line - domestic & landscape Sewer line connection Fire hydrant line connect TEP conduits | |
| TC-CFO-1025-00151 | Complete | 10/03/2025 | 11/07/2025 | Certificate of Occupancy | New 2 story climate controlled self storage facility. Includes site improvements consisting of grading and associated parking, landscaping, utility improvements, and buffer enhancements over total site area of 93,993 square feet (2.16 acres). | |
| TD-DEV-0923-00393 | Complete | 09/12/2023 | 10/16/2028 | Development Package | Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd | |
| TF-FCP-0925-00766 | Void | 09/09/2025 | N/A | Fire Construction Permit | VOID - Submit under Permit#TF-FCP-1224-01029 - Expedite - Installation of Dialer Only | |
| TZ-CMP-0724-00093 | Approved | 07/16/2024 | N/A | Zoning Compliance | Please Also add the parcel number 133-35-002T | |
| TR-UTL-0725-01126 | Complete | 07/14/2025 | 08/16/2025 | Right-of-Way (ROW) - Utility | Utility seal coat in Speedway Blvd. required by City of Tucson | |
| TF-FCP-0725-00559 | Void | 07/10/2025 | N/A | Fire Construction Permit | VOID - Submit under Permit#TF-FCP-0725-00546 - Donor antenna is installed on the roof and takes signal to the BDA (Bio-Directional Amplifier) from riser. BDA then Amplifies the signal and sends it to the DAS (Distributed Antenna System). All coax cable will be installed in conduit per fire code. System will be monitored with 7 Supervisory signals sent to the Fire Alarm Control Panel from BBU (Battery Back Up) Annunciator Panel. | |
| TF-FCP-0725-00546 | Complete | 07/03/2025 | 02/04/2026 | Fire Construction Permit | Donor antenna is installed on the roof and takes signal to the BDA (Bio-Directional Amplifier) from riser. BDA then Amplifies the signal and sends it to the DAS (Distributed Antenna System). All coax cable will be installed in conduit per fire code. System will be monitored with 7 Supervisory signals sent to the Fire Alarm Control Panel from BBU (Battery Back Up) Annunciator Panel. | |
| TR-ROW-0625-00772 | Complete | 06/05/2025 | 07/09/2025 | Right-of-Way (ROW) | Work in the driveway into the new project property to grade and install new concrete curb access ramp, driveway, connect to existing sidewalk. This will impact pedestrian traffic. | |
| TR-UTL-0423-01416 | Complete | 04/28/2023 | 05/26/2023 | Right-of-Way (ROW) - Utility | AFTER-THE-FACT: WO T75199. TEP CREW CHANGED OUT PAD MOUNTED EQUIPMENT PACA-29 AS AN EMERGENCY. | |
| TR-ROW-0425-00523 | Void | 04/17/2025 | N/A | Right-of-Way (ROW) | This work is in the property ROW for the grading and installation of the new property driveway for this building. We will use the edge-line set up so we don't impact pedestrian travel. The intent of this TC plan is to get up to the existing sidewalk but not impact the pedestrian traffice at this time. We need to remove abut 200 CY of dirt from the driveway and grade for the portion of the curb and pavement up to the actual tie-in on the street first. We can re-route pedestrian traffice later with a separate plan. | |
| TR-ROW-0425-00484 | Complete | 04/10/2025 | 05/28/2025 | Right-of-Way (ROW) | This work is in the property ROW for the grading and installation of the new property driveway for this building. We will use the edge-line set up so we don't impact pedestrian travel. Permit update 4/22/2025 - The intent of this TC plan is to get up to the existing sidewalk but not impact the pedestrian traffic at this time. We need to remove abut 200 CY of dirt from the driveway and grade for the portion of the curb and pavement up to the actual tie-in on the street first. We can re-route pedestrian traffic later with a separate plan. | |
| TS-PRM-0425-00136 | Inspections Complete | 04/09/2025 | 04/08/2026 | Sign - Permanent | Bw appr $+inspfixed- Install one illuminated cabinet perimeter wall. | |
| TF-FCP-0425-00283 | Complete | 04/04/2025 | 10/17/2025 | Fire Construction Permit | TRIPLE EXPEDITE - New self storage building - Underground Fireline | |
| TS-PRM-0325-00117 | Inspections | 03/18/2025 | 04/08/2026 | Sign - Permanent | Bw appr $+inspfixed- Install 5 lighted wall signs | |
| TC-COM-0324-00462 | Complete | 03/14/2024 | 04/15/2026 | Commercial Building | New 2 story climate controlled self storage facility. Includes site improvements consisting of grading and associated parking, landscaping, utility improvements, and buffer enhancements over total site area of 93,993 square feet (2.16 acres). | |
| TR-ROW-0225-00154 | Needs Resubmittal | 02/03/2025 | N/A | Right-of-Way (ROW) | Installation of new conduits from existing TEP transformer to new location for a transformer for the project. | |
| TR-ROW-0125-00087 | Complete | 01/17/2025 | 04/26/2025 | Right-of-Way (ROW) | Work on the west main water tap and install the line heading south under the other utilities in the property ROW. | |
| TR-ROW-0125-00080 | Void | 01/16/2025 | N/A | Right-of-Way (ROW) | **DENIED- DUPLICATE** Start working on the west main tap and the proceed to install the west line headed south under all the utilities in the ROW. | |
| TR-ROW-0125-00067 | Void | 01/14/2025 | N/A | Right-of-Way (ROW) | ROW permit for the water line connection. Start working on the west main tap and the proceed to install the west line headed south under all the utilities in the ROW. | |
| TF-FCP-0125-00027 | Complete | 01/13/2025 | 08/05/2025 | Fire Construction Permit | new fire sprinkler system | |
| TC-COM-0125-00080 | Void | 01/11/2025 | N/A | Commercial Building | VOIDED WRONG PERMIT TYPE new fire sprinkler system | |
| TR-ROW-0125-00044 | Void | 01/09/2025 | N/A | Right-of-Way (ROW) | Application to start working on the west main water tap and proceed to install the west line headed south under the existing utilities in the property ROW. There will not be any traffic control needed as this work will not obstruct the roadway or the pedestrian sidewalk. We need this permit to be open for 60 days to complete this work. | |
| TR-UTL-0125-00030 | Void | 01/06/2025 | N/A | Right-of-Way (ROW) - Utility | Water ROW permit for the connection for the water line starting at the west main tap and proceeding to install the west line heading south under all the utilities in the property ROW. This work will not affect the pedestrian sidewalk or roadway as it is in the property ROW. Please see the drawings showing locations. We will need this permit to be open for 60 days. | |
| T10AN00039 | ISSUED | 01/22/2010 | N/A | ADDRNEW | ||
| T20FC00838 | FINAL | 12/17/2020 | 07/12/2021 | FIRECONS | MODIFICATION TO EXISTING FIRE SPRINKLER SYSTEM TO ACCOMODATE DROP CEILING |
Code Enforcement
Address: 8800 E SPEEDWAY BL
Date - 12/16/2025 10:01 a.m.
Total Number Of Code Cases - (1)
| Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO0325-01079 | Closed - Unfounded | 03/13/2025 | 03/13/2025 | RWOP : Possibly exceeding height requirements and doing work without permits |
Plans
Address: 8800 E SPEEDWAY BL
Date - 12/16/2025 10:01 a.m.
Total Number Of Plans - (9)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TE-BAS-1123-00210 | Approved | 11/12/2023 | N/A | -- Commercial Water Harvesting Ordinance | Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd | |
| TE-BAS-1123-00211 | In Review | 11/13/2023 | N/A | -- Stormwater Basin | Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd | |
| TE-BAS-1123-00212 | In Review | 11/13/2023 | N/A | -- Stormwater Basin | Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd | |
| TE-BAS-1123-00213 | In Review | 11/13/2023 | N/A | -- Stormwater Basin | Site Development of 8800 E Speedway Blvd and 8790 E Speedway Blvd | |
| TP-ENT-0223-00015 | Ordinanced | 02/20/2023 | N/A | -- Rezoning | Rezone approximately 2.19 acres from C-1 to C-2 to permit development of personal storage use. | |
| TP-PRE-1122-00014 | Complete | 11/04/2022 | N/A | -- Pre-Application Conference | Rezoning from C-1 to C-2 for personal storage use. | |
| TW-MWP-0624-00034 | Withdrawn | 06/04/2024 | 06/04/2025 | -- Water Master Plan - Overall/Phased | **VOID --Tucson Speedway Self Storage | |
| TW-WAV-0524-00084 | Approved | 05/08/2024 | 05/08/2026 | -- Water Availability | New Development of a 110,000 SF self storage building containing a small office to serve the storage building on 2.1 total acres combining 133-35-002T and 133-35-002P | |
| TW-WCP-0624-00040 | Accepted | 06/04/2024 | 06/04/2025 | -- Water Construction Plan | Tucson Speedway Self Storage, Rev. #1 - 1st Submittal |
Record Requests
Address: 8800 E SPEEDWAY BL
Date - 12/16/2025 10:01 a.m.
Total Number Of Requests - (10)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-1024-07086 | Approved | 10/17/2024 | 10/18/2024 | Requests | Fence permit for work in ROW that does not require barricades or impedge pedestrian sidewalk traffic. (Permit Approved for 24 hr placement of Fencing behind the edge of Sidewalk, ONLY) We need an extension of time for this permit as it will be in place for the duration of the project. Please extend through September 2025. |
| REQ-1025-06125 | Denied | 10/13/2025 | N/A | Requests | This project is not complete all inspections need to be completed, related permits TD-DEV-0923-00393 and TF-FCP-0725-00546 need to be in completed status, and all conditions must be satisfied. Please re-request L of C/C of O once everything is complete. New 2 story climate controlled self storage facility. Includes site improvements consisting of grading and associated parking, landscaping, utility improvements, and buffer enhancements over total site area of 93,993 square feet (2.16 acres). |
| REQ-1025-06250 | Denied | 10/22/2025 | N/A | Requests | This Project is not complete related permit TF-FCP-0725-00546 needs inspection scheduled. And all conditions must be satisfied. Please re-request L of C/C of O once associated project is completed and all conditions satisfied. New 2 story climate controlled self storage facility. Includes site improvements consisting of grading and associated parking, landscaping, utility improvements, and buffer enhancements over total site area of 93,993 square feet (2.16 acres). |
| REQ-1025-06382 | Denied | 10/29/2025 | N/A | Requests | This Project has outstanding permit conditions. All conditions need to be satisfied and documentation needs to be provided for review. Please re-request once all conditions have been satisfied and review is complete. - New 2 story climate controlled self storage facility. Includes site improvements consisting of grading and associated parking, landscaping, utility improvements, and buffer enhancements over total site area of 93,993 square feet (2.16 acres). |
| REQ-1124-07817 | Approved | 11/18/2024 | 11/18/2024 | Requests | The TEP work in the ROW has not been completed and will need an additional 30 days to complete. |
| REQ-1124-07818 | Denied | 11/18/2024 | N/A | Requests | **PLEASE REQUEST FOR WORK HOUR MODIFICATIONS ON THE ORIGINAL PERMIT TR-ROW-1024-01276 THANKS **ROW Permit for Sewer Utility Connection for property/site requested extended work hours supported by our inspector to be able to complete the work. We request work hours from 7:00 am thru 5:00 pm. |
| REQ-1124-07876 | Denied | 11/19/2024 | 11/19/2024 | Requests | ROW Permit for Sewer Utility Connection for property/site at pavement saw cutting to include traffic plan. |
| REQ-1125-06455 | Complete | 11/03/2025 | 11/07/2025 | Requests | New 2 story climate controlled self storage facility. Includes site improvements consisting of grading and associated parking, landscaping, utility improvements, and buffer enhancements over total site area of 93,993 square feet (2.16 acres). |
| REQ-1222-00415 | Submitted - Online | 12/14/2022 | N/A | Requests | Rezoning from C-1 to C-2 for personal storage use. |
| REQ-1224-08300 | Denied | 12/06/2024 | N/A | Requests | ** DENIED- ONLY ONE RENEWAL PER PERMIT ALLOWED. PLEASE APPLY FOR A NEW PERMIT** Lowering TEP conduits at property to avoid conflict with water and sewer install at the property. Need a 30 day extension of time to finish the TEP work in the ROW. |