Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
8800 E SPEEDWAY BL
Apply Date:
10/11/2024
Applicant:
Description:
Lowering TEP conduits at property to avoid conflict with water and sewer install at the property.

Permit Reviews

Permit Number - TR-UTL-1024-01961
Permit Status: Complete
Permit Description: Lowering TEP conduits at property to avoid conflict with water and sewer install at the property.
Start Date Submittal Complete Date Status  
10/11/2024 RIGHT-OF-WAY REVIEW v.1 10/14/2024 REQUIRES RESUBMIT Review Details
10/16/2024 RIGHT-OF-WAY REVIEW v.2 10/17/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1024-01961
Permit Status: Complete
Permit Description: Lowering TEP conduits at property to avoid conflict with water and sewer install at the property.
Total Outstanding Activity Conditions - 3
Date Name
10/11/2024 PRE-CON
10/17/2024 Traffic Control Condition.
10/17/2024 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-1024-01961
Permite Description: Lowering TEP conduits at property to avoid conflict with water and sewer install at the property.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/17/2024 TRSP - ROW - Backfill - Placement/Compaction N/A Re-inspection required
12/17/2024 TRSP - ROW - Final N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1024-01961
Permit Description: Lowering TEP conduits at property to avoid conflict with water and sewer install at the property.
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/19/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/28/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
05/28/2025 TRSP - ROW - Final Passed