Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address NEW:
8800 E SPEEDWAY BL
Apply Date:
06/05/2025
Applicant:
Andrew Ruiz
Description:
Work in the driveway into the new project property to grade and install new concrete curb access ramp, driveway, connect to existing sidewalk. This will impact pedestrian traffic.

Permit Reviews

Permit Number - TR-ROW-0625-00772
Permit Status: Complete
Permit Description: Work in the driveway into the new project property to grade and install new concrete curb access ramp, driveway, connect to existing sidewalk. This will impact pedestrian traffic.
Start Date Submittal Complete Date Status  
06/06/2025 RIGHT-OF-WAY REVIEW v.1 06/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0625-00772
Permit Status: Complete
Permit Description: Work in the driveway into the new project property to grade and install new concrete curb access ramp, driveway, connect to existing sidewalk. This will impact pedestrian traffic.
Total Outstanding Activity Conditions - 5
Date Name
06/06/2025 The following extended traffic control set-up times were approved:
06/06/2025 BUS STOP/ ROUTE
06/06/2025 DRIVEWAY
06/06/2025 PRE-CON/PAVEMENT/SIDEWALK
06/06/2025 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-0625-00772
Permit Description: Work in the driveway into the new project property to grade and install new concrete curb access ramp, driveway, connect to existing sidewalk. This will impact pedestrian traffic.
Total Completed Inspections - 6
Date Description Inspector Results Comments
06/24/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
07/11/2025 TRSP - ROW - Barricade - Setup/Routine Passed
07/11/2025 TRSP - ROW - Barricade Takedown Passed
07/11/2025 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed
08/26/2025 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed
09/22/2025 TRSP - ROW - Final Passed