Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes

Annexations & Original City Zoning (OCZ)

Address: 831 E LIMBERLOST DR
Date - 12/23/2024 7:01 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-88-04 Vista Del Norte 7199 7286

Rezoning Cases

Date - 12/23/2024 7:01 a.m.
Total Number Of Rezone Cases - (2)
Case No. Description New Zone Status Status Date
C9-89-27 Commercial Southwest - First Avenue B-1 Expired 03/30/2009
C9-04-11 Landmark Series -1st Ave. C-1 Effectuated 12/06/2005

Permits

Address: 831 E LIMBERLOST DR
Date - 12/23/2024 7:01 a.m.
Total Number Of Permits - (22)
Permit Status Apply Date Expired Date Unit Type Description
DS10-18 Approved 12/10/2010 N/A Zoning Compliance 831 E LIMBERLOST DRIVE
TR-ROW-1224-01399 Issued 12/06/2024 01/12/2025 Right-of-Way (ROW) Dig down to water valve to shut it off.
T19RW07269 Complete 11/27/2019 02/13/2020 Right-of-Way (ROW) N.513600 - Transfer 2 cables. Remove and install 1 aerial closure, 25PR splice, and 1 U-guard. Insta; Work Order: N.513600
TR-UTL-0924-01813 Complete 09/20/2024 12/23/2024 Right-of-Way (ROW) - Utility INSTALLATION OF NEW 2" PE GAS MAIN, TIEING INTO EXSTING 4" PE MAIN LOCATED IN THE WEST LANE OF TRAFFIC ON E. LIMBERLOST DR. WORK WILL INCLUDE 1 - 5X5FT BELLHOLE IN ASPHALT/DIRT FOR TIE IN ALONG WITH 10FT OF TRENCHING IN DIRT ROW. (Note: Work is conjunction with DP21-0163)
TR-UTL-0824-01579 Complete 08/22/2024 10/04/2024 Right-of-Way (ROW) - Utility Boring 75' across Limberlost Dr, from new Common area location to existing doghouse. Trenching from the existing ped 52' northwest to uncover the existing cable and conduit, to then trench 65' east and relocate the conduit to a new ped in the common area and away from the new sidewalk location.
TR-ROW-0824-00942 Issued 08/15/2024 01/07/2025 Right-of-Way (ROW) Installing curb, sidewalk and paving in the ROW
TR-ROW-0824-00916 Complete 08/12/2024 11/14/2024 Right-of-Way (ROW) Since TR-ROW-0725-00823 seems to be stuck in the system - I am resubmitting. We need this permit right away. And the other 2 that I submitted after have been approved already. 110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt Permit update TCP revision: Extended hours - Start time 6:00 AM
TR-ROW-0824-00880 Complete 08/05/2024 10/13/2024 Right-of-Way (ROW) Connect to existing water main - 145' trenching in dirt
TR-ROW-0824-00890 Complete 08/05/2024 11/21/2024 Right-of-Way (ROW) Trenching 147' in dirt to connect to TEP pole and install pole riser
TR-ROW-0724-00823 Void 07/18/2024 N/A Right-of-Way (ROW) Revised Description: Sewer work only (see below description). Water and electrical connections to be applied for separately. 110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt, 145' of dirt trenching for water to connect to existing water main and 147' of dirt trenching to install a pole riser to TEP pole.
DP21-0163 In Review 06/23/2021 11/05/2027 Development Package Grading/ Swppp - Limberlost Estates, Lots 1 through 10 and common areas.
TE-FPU-0623-00233 Issued 06/15/2023 N/A Floodplain Use
DP15-0161 WITHDRWN 09/14/2015 10/19/2016 DEVPKG GRADING ONLY
DP17-0092 WITHDRWN 04/18/2017 N/A DEVPKG SITE/GRADING/SWPPP- LIMBERLOST ESTATES
T09OT00219 FINAL 02/02/2009 N/A FLOODPLN FLOODPLAIN STATUS REQUEST
T11OT00114 FINAL 01/18/2011 N/A FLOODPLN FLOODPLAIN USE PERMIT: TP review for realignment of the wash through the subdivision and for all proposed drainage infrastructure associated with the TP and grading plan. Seperate FUP and elevation certificates are required for Lots 4-8 during time of permitting structure.
T15BU00912 EXPIRED 08/10/2015 02/08/2016 DEMO DEMO SFR & SLEEPING QUARTERS
T16EX01214 EXPIRED 04/08/2016 06/07/2016 EXCAV 20' CURB CUT OPENING FOR CONSTRUCTION ACCESS DP15-0161
T16EX01448 FINAL 04/21/2016 06/20/2016 EXCAV REPLACING POLE LOCATED 135' WEST OF FORTUNE LOOP ON THE NORTH SIDE OF LIMBERLOST, SE CORNER OR PROPERTY
T16TC00989 EXPIRED 04/21/2016 N/A BARRICAD REPLACING POLE LOCATED 135' WEST OF FORTUNE LOOP ON THE NORTH SIDE OF LIMBERLOST, SE CORNER OR PROPERTY
T16TC01419 VOID 06/09/2016 N/A BARRICAD N/A
T19RW02846 FINAL 05/20/2019 07/22/2019 ROW Transfer 2 cables. Remove and install 1 aerial closure, 25PR splice, and 1 U-guard. Install 15' of buried cable, 25pr splice, and 2 cable tags. Excavate and expose 1 cu yd of buried facilities. Pull old pole.

Plans

Address: 831 E LIMBERLOST DR
Date - 12/23/2024 7:01 a.m.
Total Number Of Plans - (11)
Plan Number Status Application Date Exp Date Unit Type Description
S10-027 Approved 07/01/2010 04/15/2016 -- Subdivision/Plats LIMBERLOST ESTATES LOTS 1-10
TP-PRE-0323-00142 Complete 03/17/2023 N/A -- Pre-Application Conference 831 E Limberlost Drive is currently zoned and platted for a 10-unit residential development for rental income or townhomes. This rezoning application requests a plat combination and rezoning to R-2 (medium density, non-residential multi-family housing).
TW-MWP-0623-00052 Needs Resubmittal 06/27/2023 06/26/2024 -- Water Master Plan - Single-Phase Master Water Plan for 10-Lot development
TW-WAV-0523-00177 Approved 05/24/2023 05/23/2025 -- Water Availability Future 10 Lot Subdivision with associated improvements
TW-WCP-0623-00091 In Revision 06/27/2023 01/03/2025 -- Water Construction Plan Limberlost Estates, Lots 1-10 - PN 2-062-2023, Rev. #1
T10PRE0032 APPLIED 04/22/2010 N/A NEIGHBORHOOD NOTIFICATION -- LABELS
T17PRE0002 CLOSED 01/13/2017 N/A NEIGHBORHOOD NOTIFICATION -- LABELS
T21PRE0039 CLOSED 02/17/2021 N/A NEIGHBORHOOD NOTIFICATION -- LABELS Site/Grading/Swppp/Floodplain/FLD: Limberlost Estates.
T21PRE0049 CLOSED 02/26/2021 N/A NEIGHBORHOOD NOTIFICATION -- LABELS Site/Grading/FLD: Limberlost Estates.
T21PRE0222 CLOSED 10/12/2021 N/A NEIGHBORHOOD NOTIFICATION -- LABELS Site/Rezoning: Limberlost Estates.
T21PRE0235 APPLIED 11/04/2021 N/A NEIGHBORHOOD NOTIFICATION -- LABELS Multifamily - from MH-1 to R-3

Record Requests

Address: 831 E LIMBERLOST DR
Date - 12/23/2024 7:01 a.m.
Total Number Of Requests - (8)
Request Number Status Request Date Completed Date Type Description
REQ-0523-02495 Approved 05/03/2023 05/23/2023 Requests Grading/ Swppp - Limberlost Estates, Lots 1 through 10 and common areas.
REQ-0823-04213 Submitted - Online 08/03/2023 N/A Requests Duplicate Submittal of Master Water Plan, At-Risk submittal number is TW-WCP-0623-00091
REQ-0924-06064 Approved 09/10/2024 09/10/2024 Requests 110' Trenching for Sewer to connect to existing manholes and 200sf of R&R Asphalt Permit update TCP revision: Extended hours - Start time 6:00 AM Please extend ROW permit for 60 days. Work is not done and we will need to work on sewer after paving.
REQ-0924-06065 Denied 09/10/2024 09/10/2024 Requests ** DENIED DUE TO NO PRE ACTIVITY MEETING SCHEDULED/ HELD VIA DASHBOARD** Connect to existing water main - 145' trenching in dirt Please extend permit for 1 month. Work in the ROW is not complete.
REQ-0924-06066 Denied 09/10/2024 09/10/2024 Requests ** DENIED DUE TO NO PRE ACTIVITY MEETING SCHEDULED OR HELD VIA DASHBOARD** Trenching 147' in dirt to connect to TEP pole and install pole riser Please renew ROW permit for 2 months. Work in the ROW is not complete yet. And we will need to work on utilities after paving.
REQ-0924-06137 Approved 09/12/2024 09/12/2024 Requests Trenching 147' in dirt to connect to TEP pole and install pole riser Please renew Permit for 60 days. Work is not done and we will need to work on the utilities after paving.
REQ-0924-06138 Approved 09/12/2024 09/12/2024 Requests Connect to existing water main - 145' trenching in dirt Please renew permit for 30 days. Work is not complete
REQ-1124-07847 Approved 11/18/2024 11/18/2024 Requests Please renew ROW for 60 days. Work is not completed yet.