Permit Details

Status:
In Review
Type:
Right-of-Way (ROW)
Address:
160 N STONE AV
Address NEW:
160 N STONE AV
Apply Date:
09/01/2026
Applicant:
Desert Barricade / Eric Horne
Description:
The crew will close E. Alameda St. to park a crane truck to move equipment to the roof. There will also be a lane closure for a roll-off area. ** See conditions required for additional information. Uploading of TNE required prior to the start of work. Notify Park Tucson for parking meter requirements. 06/05/2026 - TCP revision uploaded. 07/01/2026 - Request for 60 Day Renewal as of 07/03/2026 I am requesting a new Right-of-Way permit to provide for the continuance of work associated with previously approved permit number TR-ROW-0526-00583. All site conditions and scope of work remain consistent with the original application.

Permit Reviews

Permit Number - TR-ROW-0926-00954
Permit Status: In review
Permit Description: The crew will close E. Alameda St. to park a crane truck to move equipment to the roof. There will also be a lane closure for a roll-off area. ** See conditions required for additional information. Uploading of TNE required prior to the start of work. Notify Park Tucson for parking meter requirements. 06/05/2026 - TCP revision uploaded. 07/01/2026 - Request for 60 Day Renewal as of 07/03/2026 I am requesting a new Right-of-Way permit to provide for the continuance of work associated with previously approved permit number TR-ROW-0526-00583. All site conditions and scope of work remain consistent with the original application.
Start Date Submittal Complete Date Status  
09/02/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-0926-00954
Permit Status: In review
Permit Description: The crew will close E. Alameda St. to park a crane truck to move equipment to the roof. There will also be a lane closure for a roll-off area. ** See conditions required for additional information. Uploading of TNE required prior to the start of work. Notify Park Tucson for parking meter requirements. 06/05/2026 - TCP revision uploaded. 07/01/2026 - Request for 60 Day Renewal as of 07/03/2026 I am requesting a new Right-of-Way permit to provide for the continuance of work associated with previously approved permit number TR-ROW-0526-00583. All site conditions and scope of work remain consistent with the original application.
Total Outstanding Activity Conditions - 7
Date Name
09/02/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
09/02/2026 The following extended traffic control set-up times were approved: 24hr WB Left Lane Closure on Alameda blvd w/Sidewalk Closure
09/02/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/02/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/02/2026 Noted 1-3 day set up= $0 Loss of Use fee. No Estimate provided at this time. Total Loss of Use to be determined by physical field inspection review at Permit Closeout"
09/02/2026 Traffic control set-up approved between 9AM - 3:30PM
09/02/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.