Activity Search: TP-PRE-0523-00227
Activity
Parcel Attributes
| Parcel | 21116006A |
|---|---|
| Jurisdiction | Pima County |
| Flood Related Information | FEMA Floodplain Area |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Plans
Date - 08/20/2026 9:22 p.m.
Total Number Of Plans - 1
| Plan Number | Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TP-PRE-0523-00227 | Complete | 05/31/2023 | N/A | Pre-Application | Per Tucson Water request, this project is provided to address the design of improvements and control valve replacements for several of the CAVSARP recharge basin turnout facilities. Tucson Water provided the following additional direction for the scope of work: “Initially the scope of work would include improvements at four of the basins, with improvements of the remaining six basins to follow. In developing the scope of work some of the pertinent items discussed include the following: 1. Replacing the flow control valves at recharge basin RB-102, RB-103, RB-106 and RB-109 would be included in the initial set. 2. The new flow control valves would be motor operated plug valves with the appropriate size along with appropriate improvements to the existing steel piping. 3. The detailed design will focus on preparing a set of plans for use by a JOC contractor and would include Civil-Mechanical, Electrical, and Instrumentation and Control sheets. Stantec (“Designer”) will provide design services for the project. Tucson Water is the owner and the client. |