Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Activity

 

Parcel Attributes

Parcel12901010C
JurisdictionTucson, Pima County
City of Tucson ZoningC-1
Tucson WardWard 6
Tucson Registered NeighborhoodArroyo Chico
Major Street & Route

Gateway Route
-
Intersection Buffer

National Register Historic DistrictSunshine Mile Historic District
Structure on National Register of Historic Places

Contributor

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Permits

Date - 09/06/2026 6:09 p.m.
Number Of Permits - (1)
Permit Status Apply Date Expired Date Unit Type Description
TC-COM-0826-01341 In Review 08/19/2026 N/A Commercial Building The proposed scope of work consists of a complete replacement of the existing commercial built-up roofing (BUR) system and includes the following: • Complete removal of the existing three-ply built-up roofing system down to the structural wood roof deck. • Installation of a new roofing assembly, including polyisocyanurate roof insulation, cover board, and a new three-ply built-up roofing system. • Installation of new cant strips at roof-to-wall, parapet, curb, and other flashing transitions in accordance with the roofing manufacturer's published installation requirements. • Application of primer and elastomeric roof coating over the new roofing system, including coating of the parapet walls where required. • Replacement of roof flashings, including pipe flashings, split boots, roof vents, exhaust caps, rain caps, drip edge, and other associated roofing accessories as required. • Temporary removal and reinstallation of rooftop mechanical equipment, including HVAC condensing units, exhaust fans, ductwork, and associated electrical connections, as necessary to facilitate replacement of the roofing system. • Use of a crane to remove and reinstall rooftop mechanical equipment in phases while maintaining building operations. • Use of a telehandler/forklift to transport roofing materials and equipment to the roof throughout the project. • Replacement of the existing awning roof panels where they are affected by the work. • Disposal of roofing debris and completion of all work necessary to restore the roofing system to a completed condition.