Address Search: 2362 E BROADWAY BL
Search
Parcel Attributes
| Parcel | 12901010C |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-1 |
| Tucson Ward | Ward 6 |
| Tucson Registered Neighborhood | Arroyo Chico |
| Major Street & Route | Gateway Route |
| National Register Historic District | Sunshine Mile Historic District |
| Structure on National Register of Historic Places | Contributor |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 2362 E BROADWAY BL
Date - 09/06/2026 1:22 p.m.
Total Number Of Annexations & Original City Zoning (2)
Rezoning Cases
Date - 09/06/2026 1:22 p.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date |
|---|---|---|---|---|
| C9-20-11 | Sunshine Mile UOD | Ordinanced | 10/20/2020 |
Permits
Address: 2362 E BROADWAY BL
Date - 09/06/2026 1:22 p.m.
Total Number Of Permits - (4)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0826-01324 | Needs Resubmittal | 08/19/2026 | N/A | Commercial Building | The proposed scope of work consists of a complete replacement of the existing commercial built-up roofing (BUR) system and includes the following: • Complete removal of the existing three-ply built-up roofing system down to the structural wood roof deck. • Installation of a new roofing assembly, including polyisocyanurate roof insulation, cover board, and a new three-ply built-up roofing system. • Installation of new cant strips at roof-to-wall, parapet, curb, and other flashing transitions in accordance with the roofing manufacturer's published installation requirements. • Application of primer and elastomeric roof coating over the new roofing system, including coating of the parapet walls where required. • Replacement of roof flashings, including pipe flashings, split boots, roof vents, exhaust caps, rain caps, drip edge, and other associated roofing accessories as required. • Temporary removal and reinstallation of rooftop mechanical equipment, including HVAC condensing units, exhaust fans, ductwork, and associated electrical connections, as necessary to facilitate replacement of the roofing system. • Use of a crane to remove and reinstall rooftop mechanical equipment in phases while maintaining building operations. • Use of a telehandler/forklift to transport roofing materials and equipment to the roof throughout the project. • Replacement of the existing awning roof panels where they are affected by the work. • Disposal of roofing debris and completion of all work necessary to restore the roofing system to a completed condition. | |
| TC-COM-0826-01341 | In Review | 08/19/2026 | N/A | Commercial Building | The proposed scope of work consists of a complete replacement of the existing commercial built-up roofing (BUR) system and includes the following: • Complete removal of the existing three-ply built-up roofing system down to the structural wood roof deck. • Installation of a new roofing assembly, including polyisocyanurate roof insulation, cover board, and a new three-ply built-up roofing system. • Installation of new cant strips at roof-to-wall, parapet, curb, and other flashing transitions in accordance with the roofing manufacturer's published installation requirements. • Application of primer and elastomeric roof coating over the new roofing system, including coating of the parapet walls where required. • Replacement of roof flashings, including pipe flashings, split boots, roof vents, exhaust caps, rain caps, drip edge, and other associated roofing accessories as required. • Temporary removal and reinstallation of rooftop mechanical equipment, including HVAC condensing units, exhaust fans, ductwork, and associated electrical connections, as necessary to facilitate replacement of the roofing system. • Use of a crane to remove and reinstall rooftop mechanical equipment in phases while maintaining building operations. • Use of a telehandler/forklift to transport roofing materials and equipment to the roof throughout the project. • Replacement of the existing awning roof panels where they are affected by the work. • Disposal of roofing debris and completion of all work necessary to restore the roofing system to a completed condition. | |
| T20RW00752 | FINAL | 02/06/2020 | 04/11/2020 | ROW | Starting on the North/West side of Broadway, Riser up TEP and Overlash 288' going South continue going West 303 continue North/West 80' to Drop NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 | |
| T20RW06259 | FINAL | 11/19/2020 | 12/17/2020 | ROW | REPAIR HIT WATER MAIN NORTH SIDE OF LOT DIRT @ 6LF., "EMERGENCY AFTER THE FACT PERMIT" |