Activity Search: T21RW02007
Activity
Parcel Attributes
| Parcel | 11717020A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-3 |
| Tucson Ward | Ward 6 |
| Tucson Downtown Incentive Zone | Downtown Infill Incentive District, Downtown Core |
| Rio Nuevo Downtown | Rio Nuevo - Downtown |
| Rio Nuevo Multipurpose Facilities District | Yes |
| Redevelopment | Downtown Redevelopment District |
| Tucson Registered Neighborhood | Armory Park |
| Major Street & Route | Gateway Route |
| National Register Historic District | Downtown Tucson Historic District |
| Structure on National Register of Historic Places | Contributor |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Permits
Date - 08/17/2026 2:15 a.m.
Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T21RW02007 | Final | 04/26/2021 | 06/28/2021 | ROW | Orginal Permit reference T20RW05542 Part 1: From The TEP Pole East 144 S 5th Ave, begin 30' aerial overlash, adding 288ct fiber, heading South, continue 263' aerial overlash heading East, continue 142' aerial overlash heading North. Riser down and begin 10' trench/bore placing 2-2'' conduit and 288ct and 48ct fiber heading North, place 4x4 pothole and place new COX Vault. Continue 15' trench/bore heading North. Continue 30' trench/bore heading West to out of ROW . Part 2 : From the TEP pole S of 210 S 12th Ave , riser down and begin 6' trench/bore heading East, placing 2-2'' conduit and 288ct and 48ct fiber, continue North to existing COX power supply. Continue 7' trench/ bore heading East and placing 4x4 pothole, 2-2'' conduit and 288ct and 48ct fiber, place new COX Cabinet, continue 7' and place 4x4 pothole and place new COX vault, continue 7' trench/bore and place 4x4 pothole and place new COX ped, tie in. Work starts along west side of S 5th Av just north of E 12th St, continues east along north side of E 12th St and turns north along west side of S Herbert Av. Proof of notification is required at the time of the preconstruction meeting. |