Plan Number: T22PRE0046
Parcel: Unknown

Review Status: Completed

Review Details: PREAPPLICATION LABELS

Plan Number - T22PRE0046
Review Name: PREAPPLICATION LABELS
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/21/2022 DSTIFFE1 COT NON-DSD TRAFFIC Approved No Comments
03/21/2022 JPEELDA1 COT NON-DSD FIRE Completed Plans shall show the existing fire hydrant locations. Hydrants shall meet the 2018 IFC, Section 507.5, 507.5.1 Where required. Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 400 ft from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided exception: building that have fire sprinklers are allowed 600'

Provide a life safety sheet

Questions:
Jennifer Peel-Davis
Jennifer.Peel-Davis@Tucsonaz.gov
520-837-7033
Fire Plans Examiner
03/22/2022 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed For any water related questions, please contact Mr. Michael Mourreale at Michael.Mourreale@TucsonAz.gov.


Tim Rowe, P.E., Civil Engineer
Tucson Water, New Area Development Unit
03/23/2022 AWARNER1 LANDSCAPE REVIEW Completed CDRC TRANSMITTAL

PROJECT: Salad and Go
ACTIVITY NO. T22PRE0046
ADDRESS/PARCEL: 7980 E Speedway Blvd

7.6 Landscaping and Screening
The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4. and Administrative Manual 2-10.

• 10’ street landscape border is required along Speedway Blvd. Existing, healthy plants can count towards this requirement.

Commercial Rainwater Harvesting plan is required UDC Technical Standards Manual – Section 4-01.0.0. and Section 5-01.0.0 Landscaping and Screening
Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design.
Using Low Impact Development design and water harvesting provides critical basin detention and first flush retention for all new development and impervious area. The newly adopted Detention/Retention Manual can be found: https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-final-201406-manual.pdf
With CoT edits to the manual are found at: https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf

If you have any questions about this transmittal, contact Anne Warner, RLA
PDSD Landscape/NPPO Review at email anne.warner@tucsonaz.gov
03/24/2022 SAMUEL ROGERS ZONING REVIEW Completed CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Samuel Rogers, Planner

PROJECT: Thursday Pre-submittal meeting - T22PRE0046
Address: 7910 E SPEEDWAY BL
Parcel(s): 13327001C
Zoning: C-1
Existing Use: Vacant
Proposed Use: Food and Beverage Sales

TRANSMITTAL DATE: 3/24/22

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. Food and Beverage Sales is an allowed use in this the C-1 zone and is subject to Use-Specific Standard 4.9.13.O
3. E Speedway Bl is a Major Street and Route requiring a setback/perimeter yard of 21' measure from the back of the existing or future curb location.
4. Parking is required at 1 space per 300 sqft, 3 parking spaces will be required. Provide a note on the DP if there is a shared parking agreement or if the site is considered a shopping center for parking.
5. The striped access path cannot pass behind any parking spaces.
6. No loading area is required.
7. There are no design requirements.
8. You will need a Development Package (DP) issued prior to any building permits, however, both permits can be in review at the same time.
9. Show setbacks from the canopy over the drive thru.
10. What is the gray dashed line?
11. Provide a DP for the entire site. You may update an existing DP if available (DP13-0124).
12. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions please contact me at Samuel.Rogers@tucsonaz.gov or (520) 837-6932.
03/24/2022 SBLOOD1 ENGINEERING REVIEW Completed 1. First Flush Retention will be required, but for detention just show that the new development is compatible with the commercial development master drainage plan.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov