Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 7980 E SPEEDWAY BL
Search
Parcel Attributes
| Parcel | 13327001C |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Parking Lot |
| City of Tucson Zoning | C-2, C-1 |
| Tucson Ward | Ward 2 |
| Tucson Registered Neighborhood | Carriage Park |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 7980 E SPEEDWAY BL
Date - 02/05/2026 5:20 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 02/05/2026 5:20 p.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date |
|---|---|---|---|---|
| C9-89-14 | Speedway/ Pantano Partners - Speedway Boulevard | B-2A | Effectuated | 03/26/2009 |
Special Development Requests & Requirements
Address: 7980 E SPEEDWAY BL
Date - 02/05/2026 5:20 p.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| H000004055 | CLOSED | 04/25/2012 | N/A | Historical Information |
Permits
Address: 7980 E SPEEDWAY BL
Date - 02/05/2026 5:20 p.m.
Total Number Of Permits - (19)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-CFO-1023-00200 | Complete | 10/19/2023 | N/A | Certificate of Occupancy | Void: using old TCO request TC-CFO-1023-00196- Proposed Construction of new 2-lane drive-through salad-assembly restaurant with carry out facility. | |
| TC-CFO-1023-00196 | Complete | 10/16/2023 | 03/17/2024 | Certificate of Occupancy | Proposed Construction of new 2-lane drive-through salad-assembly restaurant with carry out facility. | |
| TS-TMP-0923-00023 | Issued | 09/26/2023 | N/A | Sign - Temporary | Salad & Go - Temporary Grand Opening Promotional Signage | |
| TC-COM-0823-01910 | Issued | 08/04/2023 | 04/10/2024 | Commercial Building | Private sewer New tap to public line | |
| DP22-0167 | Issued | 06/21/2022 | 03/28/2027 | Development Package | Site - Salad and Go. Restaurant with carry out facility. No interior or exterior eating/drinking facilities available on this project site. Fully Sprinklered, one story, approx. 828 sf. gross, with two canopies, walk-up=184sf, drive-through=113 sf, total covered area shall be 1,125 sf. 4 parking stalls provided, one of which is Van-Accessible. | |
| T22CM04580 | Complete | 06/18/2022 | 09/23/2024 | Commercial Building | Proposed Construction of new 2-lane drive-through salad-assembly restaurant with carry out facility. | |
| TR-UTL-0623-01704 | Complete | 06/02/2023 | 07/12/2023 | Right-of-Way (ROW) - Utility | 2572932 7980 E. Speedway blvd 14-15-09NW excavate for new service front north side of address; 6lf dirt / MLM | |
| TS-PRM-0623-00338 | Complete | 06/01/2023 | 04/25/2024 | Sign - Permanent | Install signs and menu items | |
| DP22-0168 | VOID | 06/21/2022 | N/A | DEVPKG | Proposed Construction of new 2-lane drive-through salad-assembly restaurant with carry out facility. There will be no interior or exterior eating/drinking facilities available on this project site. Fully Sprinklered, one story, approx. 828 sf. gross, with two canopies, walk-up=184sf, drive-through=113 sf, total covered area shall be 1,125 sf. 4 parking stalls provided, one of which is Van-Accessible. | |
| T03OT01837 | CLOSED | 10/16/2003 | 12/21/2008 | SIGN | SIGN:ELECTRIC:6188 | |
| T05BU02231 | FINAL | 09/08/2005 | 12/02/2008 | TANKS | REPLACE:EXISTING GASOLINE DISPENSERS | |
| T05OT00350 | WITHDRWN | 02/16/2005 | 11/19/2006 | SIGN | SIGN:ELECTRIC:8521 UNION DISTRIBUTING | |
| T05OT01938 | FINAL | 08/05/2005 | 11/19/2006 | SIGN | SIGN:# 9476 UNION DISTRIBUTING | |
| T06BU01314 | FINAL | 05/25/2006 | 04/25/2007 | TANKS | TANKS:UNDERGROUND | |
| T06CM03119 | WITHDRWN | 05/25/2006 | 11/22/2006 | COMBO | TI: GAS STATION - REMOVE AND REPLACE UNDERGROUND STORAGE TANKS | |
| T06EL01017 | FINAL | 05/26/2006 | 04/28/2007 | ELECT | ELEC FOR REPL OF UNDERGROUND FUEL TANKS REV1: Addition of new pump and new electrical panel. | |
| T08CM01905 | EXPIRED | 06/04/2008 | 01/14/2009 | COMBO | INSTALL PIPE FO RSOIL VAPOR EXTRACTION SYSTEM/PUT 6' HIGH CHAIN LINK FENCE AROUND AREA/ TEMP ELECTRIC SERVICE 400 AMP | |
| T14BU00022 | EXPIRED | 01/10/2014 | 08/11/2014 | TANKS | REMOVE ALL FUEL TANKS | |
| T14CM00183 | EXPIRED | 01/10/2014 | 07/09/2014 | COMBO | REMOVE CANOPY OVER FUELING ISLANDS |
Plans
Address: 7980 E SPEEDWAY BL
Date - 02/05/2026 5:20 p.m.
Total Number Of Plans - (1)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T22PRE0046 | CLOSED | 02/28/2022 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | Site: Salad and Go. Construction of a new 2-lane drive-through restaurant. There will be no interior or exterior eating / drinking facilities available on this project site. A fully-sprinklered one-story building, approx. 1,015 gross square feet. |